{
 "answer": "In the Rural Municipality of Blucher No. 343, Saskatchewan, building permit rules are set by Bylaw No. 10-2004 - Building Bylaw, verified 2026-09-27. Permit required for: A permit is required whenever work regulated by the Act and Regulations is to be undertaken. Administered by: Local authority or its authorized representative.",
 "municipality_id": "gx-000872",
 "municipality": "Rural Municipality of Blucher No. 343",
 "status_type": "Rural Municipality",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "https://www.rm343.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Bylaw No. 10-2004 - Building Bylaw",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://rm343.com/wp-content/uploads/2016/01/10-2004.byl.PDF",
   "summary": "A Bylaw Respecting Buildings of the R.M. of Blucher No. 343 (administration/enforcement of building standards). Verified adopted.",
   "capture_sha256": "a60a26897817d58c1b35f3f5c4e85c86f661602099d6fb055fc2216a12a177c0",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "10-2004",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/a60a26897817d58c1b35f3f5c4e85c86f661602099d6fb055fc2216a12a177c0.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "A permit is required whenever work regulated by the Act and Regulations is to be undertaken.",
    "fee_basis": "Based on construction value: $6.00 per $1,000 (0-$150,000), $5.00 per $1,000 ($150,000-500,000), $4.00 per $1,000 ($500,000-3,000,000), $3.50 per $1,000 (over $3,000,000); minimum $100 for one-unit dwellings/accessory buildings, $200 for all other buildings.",
    "authority": "Local authority or its authorized representative"
   },
   "fact_citations": {
    "permit_required_for": "A permit is required whenever work regulated by the Act and Regulations",
    "fee_basis": "Building Permit Fee Schedule",
    "authority": "local authority or its authorized representative"
   },
   "transcript_url": "/ca/sk/rural-municipality-of-blucher-no-343/building-permits/bylaw-10-2004/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/sk/rural-municipality-of-blucher-no-343/building-permits/"
}