Bylaw No. 02-2025 (A Bylaw Respecting Buildings / "Building Bylaw")

Rural Municipality of Britannia No. 502, Saskatchewan · No. 02-2025 · summary & facts

This is the exact embedded text of the captured official document. Snapshot c5ac9f86cec3 · verified 2026-09-27 · original document · archived snapshot · unofficial consolidation, the official version is held by the municipal clerk.

Bylaw 02-2025 Appendix "A" Page | 1 R.M of Britannia No. 502 Building Permit Application IN OFFICE USE: Date Received File Number Tax Roll Fees / Receipt Deposit BUILDING INSPECTOR: Building Inspector File: Date Approved Building Inspector Signature 1. Landowner Information: Applicant: Mailing Address: Phone: Cell: Fax: Email: 2. Contractor (applicant) Information: Check if same as applicant Contractor: Mailing Address: Phone: Cell: Fax: Email: Architect and/or Engineer: Address: Phone: Email: 3. Legal description of land proposed for development: All/Part of the ¼, Section , Township , Range , W3 LSD Lot Block Registered Plan No. Certificate of Title No. 4. Proposed Building Construction: a. Residential Single Family Residence (Stick Built) Ready to Move Home (RTM) Attached Garage Detached Garage/shop/Accessory Building Residential Addition Residential Interior Renovation Basement Development Continued... Bylaw 02-2025 Appendix "A" Page | 2 Accessory Building (Shed, Gazebo etc.) Deck Other: b. Commercial/Industrial Commercial Building Industrial Building Institutional Building / Utility Building Other: 5. Description of Work: _______________________________________________________________________________ _______________________________________________________________________________ _______________________________________________________________________________ 6. Additional Information: Estimated Cost of Development: *Construction Value includes the total cost of the completed project (design, materials and labour). The R.M. of Britannia reserves the right to assign a construction value, as applicable. Dimensions: Length ft. x Width ft. x Height ft. Size: _________ ft² Finished Areas: Main ft² 2nd Storey ft² Bsmt ft² Attached Garage Area:____________ft2 Start Date: __________________________________ Estimated Completion Date: Bylaw 02-2025 Appendix "A" Page | 3 7. Site Plan In order to process the building permit application, all submissions must include a completed site plan of the proposed project; submission of an incomplete site plan will be considered as an incomplete application and returned to the applicant: Site plan must clearly indicate property lines, estimated distances/measurements, and adjacent road/streets, as well as show any water courses, sloughs, wooded areas, existing structures, existing approaches, utility lines, septic systems, etc. Bylaw 02-2025 Appendix "A" Page | 4 8. Letter of Authorization: This section must be signed on all applications where the applicant is not the landowner. Please ensure that all names and signatures of those listed on the certificate of title are included. I/We _________________________________________________________________________________ being the owner(s) of ____________________________________________________________________ Do hereby authorize: ____________________________________________________________________ to act as an applicant on my/our behalf regarding the ___________________________________ application of the above-mentioned lands. Name of Applicant(s): _______________________________________________________________________ Mailing Address: __________________________________________________________________________ Phone ____________________________ Fax: ______________________________ Email: ________________ Landowner Signature: _____________________________________ Date:_____________________________ Landowner Signature: _____________________________________ Date:_____________________________ If the landowner is a registered company, documentation of those with signing authority under company seal is required 9. Right of Entry and Declaration by Applicant I/we hereby grant approval for the R.M. of Britannia staff to access the property for a site inspection as the Registered Owner(s) and/or person acting on the Registered Owner's Behalf: Yes No I am the owner or Applicant with the consent and authority of the owner that is the subject matter of this permit application. I understand and agree that this application for a Building Permit, and any Building Permit issued pursuant to the application, or any information thereto, is not confidential and may be release by the Municipality. Further, I/we acknowledge that all buildings must comply with the Municipal Building Bylaw and with the standards of the National Building Code of Canada and the Uniform Building and Accessibility Standards Act to Statistics Canada, Building Official, Other ministries, and agencies as required. I/we further agree to all conditions and/or regulations stipulated by the Building Offical. I/we further agree to the indemnify and hold harmless the Municipality from and against any claims, demands, liabilities, costs or damages to the development undertaken pursuant to this application. DATE: SIGNATURE: DATE: SIGNATURE: Bylaw 02-2025 Appendix "B" 1 R.M of Britannia No. 502 BUILDING PERMIT Applicant: Contractor: Legal Land Location: Permit Type: Project Description: Inspections Required: Foundation Framing & Insulation Final Total Fees Payable: Application Fee Plans Inspection Fee Deposit: Amount Receipt Refund Amount Cheque No. Please review attached Plans Examination Report for more information. It is the permit holder's responsibility to schedule all required inspections. This permit expires 12 months from the date of issue ______________________ _________________________________________ Date Authorized Municipal Official This permit has been issued in accordance with The Construction Act, 2021 ________________________________________________________________________________________________________________________ A permit shall expire and the right of an owner under the permit shall terminate if: (a) the work authorized by the permit is not commenced within 6 months from the date of issue of the permit and actively carried out thereafter, or (b) work is suspended for a period of 6 months (c) the work authorized by the permit must be completed within 12 months or an extension is required, prior to the expiry of the permit. GENERAL CONDITIONS: 1. All municipal zoning and development requirements are satisfied. 2. All work, materials and administration of construction, will comply with the National Building Code. 3. All requirements of the Plumbing and Gas, Boilers, Elevators, Fire, Electrical Safety Services and other authorities will be met where applicable. Preferred handling of construction waste: Construction waste which primarily consists of new materials, should be separated into waste streams (eg. dimensional lumber, plywood, insulation, metals, roofing, carpeting and landscaping waste) which can be reused or recycled. Mixed, unusable construction waste should be disposed of at a waste disposal ground. Waste includes wood, drywall, brick, earth, metals, insulation, electrical and plumbing materials, siding, carpeting, roofing material and concrete. Contact SASK 1st Call at 1-866-828-4888 prior to digging Privacy Notice: All information on this permit will be shared with Statistics Canada by the RM of Britannia No. 502 through a Monthly Building and Demolition Permit Survey. The RM of Britannia No. 502 is required to participate in this monthly survey under the authority of the Statistics Act, which ensures that the information provided in the report will be kept confidential. All personal information collected, used, disclosed or retained by Statistics Canada is protected by the Privacy Act and by the Statistics Act, whether provided by a respondent or received from a third party. All information provided to Statistics Canada through Surveys, the census, or any other source is confidential. If you have concerns regarding your privacy as it related to Statistics Canada, please contact the Office of the Privacy Management and Information Coordination at 613-894-4086. JWS Inspections File No. Britannia File No. Bylaw 02-2025 Appendix "C" Rural Municipality of Britannia No. 502 Order to Comply Under The Construction Codes Act Issued to Property Location Project Description Permit Number Inspection Date Contraventions(s) Pursuant to subsection 25(1), (2), (3), (4) or (5) of The Construction Codes Act, The Building Codes Act, National Building Code of Canada, the National Energy Code of Canada for Buildings and Building Bylaw 20-2022, the following contraventions are noted: 1 2 3 Order to Comply Pursuant to subsection 25(1), (2), (3), (4) or (5) of The Construction Codes Act, The Building Codes Act, National Building Code of Canada, the National Energy Code of Canada for Buildings and Building Bylaw 20-2022, you are hereby ordered to comply with the following: 1 2 3 Compliance with this order is required on or before __________ ___________, 20___. Failure to Comply Failure to comply with the order by the date provided may result in the commencement of legal enforcement as provided by The construction Codes Act. See Sections 26, 36 and 40 of the Construction Codes Act. Issued by Building Official License No. Signature Phone Date Email Please contact _________________at _________________ by ____________________ 20__. Bylaw 02-2025 Appendix "D" Rural Municipality of Britannia No. 502 R.M of Britannia No. 502 Building Permit Extension Application CONDITIONS OF PERMIT: - This extension is for the period of 365 days following the date of expiry of the above noted building permit. - Any work required to complete the project after the extension period requires a new development and building permit permit. - It is the responsibility of the permit holder to contact the building official for inspections within the term of this building permit. - This extension is also subject to the conditions under which the original permit was issued. - There may be additional conditions added to the building permit extension if granted. _________________________________________ ____________________________ SIGNATURE OF LANDOWNER DATE Please contact the building official upon the issuance of the building permit extension to discuss building inspection schedule. IN OFFICE USE: APPROVED or DENIED Building Permit #: Date issued: Date Expired: Fee: $50.00 Receipt No: Council Res #: Denied Reason: _________________________________________ ____________________________ DEVELOPMENT SERVICES OFFICER DATE Applicant: ___________________________________________________________________ Mailing Address: ______________________________________________________________ Phone Number: ________________________ Email: _________________________________ Permit No: _______________ Legal Land Location: ____________________________________ Reason For Building Permit Extension: _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ Bylaw 02-2025 Appendix "E" R.M of Britannia No. 502 Building Fee Schedule . Rural Municipality of Britannia No. 502 Administration Fees Fee ($) Building Permit Application $100.00 Saskatchewan Assessment Management Agency Inspection Fee $ 20.00 Building Permit Extension $50.00 Rural Municipality of Britannia No. 502 Deposit Fees Residential (Primary Use) $1000.00 Residential - Accessory building $500.00 Commercial/ Industrial (Primary Use) $2500.00 Commercial/ Industrial - Accessory Buildings $1000.00 Penalty Fee Construction projects that have started pior to a building permit has been issued are subject to a penalty fee of two times the applicable fee of the Plans Examination Report and Inspection Fee. R.M of Britannia No. 502 Building Permit Extension Application Building Type Fee ($) Building Permit Extension Application $50.00 Bylaw 02-2025 Appendix "E" continued... JWS Inspections Services Ltd Fee Schedule Plans Examinations Report and Inspection Fees JWS Inspection Services Ltd: Residential Fees Building Type Fee ($) Single Family Dwelling (stick built) $4.25/$1,000.00 per value of construction Single Family Dwelling - Additions $4.25/ft2/$1,000.00 of construction value(Minimum $450.00) Detached Garage with second floor suite $4.25/ft2/$1,000.00 of construction value (Minimum $450.00) Ready to Move Homes (RTM) - No Garage $0.36/ ft2 Attached Garage (Existing SFD/ RTM) $350.00 Accessory Building up to 600 ft2 $350.00 Accessory Building (600 ft2 to 2000 ft2) $450.00 Manufactured Homes/ Mobile $200.00 Decks $100.00 Basement Development $150.00 Commercial Buildings, Industrial Buildings, and any Accessory Buildings <2000 ft2 $4.50/ $1000.00 Plans Examinations Report and Inspection Fees JWS Inspection Services Ltd. Notes 1. Costs per thousand must include a material & labor price as if it were awarded to lowest bidder (not including price). $160.00-$200.00 per sq.ft. used as a reference for cost. 2. A minimum 7 day inspection notice will be required for all inspections. 3. Two sets of blue prints are to be collected & forwarded for plan review along with site plan, building permit, and map. Municipality will be invoiced with GST upon completion and return of plan review. One set of drawings, with 2 copies of the plan review report will be forwarded for municipality to distribute back to owner/contractor. Engineer involvement may be required at the discretion of the building inspector on projects that do not conform to the National Building Code; this is the responsibility of the owner/contractor. 4. Permits may be expired at the inspector's discretion if work has been abandoned for a period of 1 year. Most permits will be given 2 year time period to complete the work and call for inspections. If after 2 years a final inspection has not been called in, a final inspection report may be completed & given to the owner to sign off, new permit to be obtained. JWS Inspection Services Ltd. Refunds Permit Cancellations (Required in Writing) 75% refund if requested within 3 months of the permit being issued 50% refund id request after 3 months of the permit being issued Bylaw 02-2025 Appendix "E" continued... JWS Inspection Services Ltd. Order Writing Building Type Fee ($) Order Writing $100/hour Fees within Appendix "E" are Bylaw 02-2025 are subject to applicable taxes. Appendix "F" Updated November 2022 Development and Building Public Information Document Development Permit ≠ Building Permit Development Permit and Building Permit are two separate processes. In most cases a development permit must be approved prior to a building permit being issued . BUILDING PERMIT APPROVES - Building Structure. ENSURES COMPLIANCE WITH - The Construction Codes Act. - The Building Codes Act. - National Building Code of Canada. - National Energy Code of Canada for Buildings. - Municipal Building Bylaw. BUILDING PERMITS REQUIRED NOT REQUIRED - New building and structure construction, including garages, decks, patios, porches, entrance steps, wheelchair ramps. - Structural changes to existing buildings. - New and ready to move (RTM) buildings. - Demolition, repair, relocation alteration or addition to an existing building or structure. - Change of occupancy or use of an existing building. - Accessory buildings larger than 10m2 (107ft2). - Decks over 2ft/600mm above grade, and roof enclosures over existing or new decks. - Retaining walls, swimming pools (including any device holding over 2 ft/60 mm of water. - Basement development in existing or new buildings. - Installing bay, bow, or box windows in new or existing openings - Installation or replacement of any fire alarm system - Alterations or repairs to heritage buildings - Basement developments, secondary suites or fireplaces in your home - Demolition, repair, alteration or addition to an existing building or structure including: solar panel installation, repair after fire or water damage and structural repairs. - Fences, private sidewalks & driveways, planters. - Open decks under 2 ft/600 mm above grade. - Painting, Cabinet work, decorating and laying flooring. - Replacing materials (eg: roofing or siding) or for cosmetic upgrades (eg: painting or flooring) not affecting structural integrity or life safety. - Accessory Buildings and Structures (garden sheds, etc) that do not exceed 10m2 (107ft2). provided that minimum setback requirements are maintained as per the zoning bylaw, 24-2021. - Replacing doors and windows of the same size. - Accessory farm building and structures - Replacing doors and windows in existing openings, as long as the outside dimension of the window or door does not change, the opening area is not changing and the level of life/fire safety is not changing, ie. the fire protection rating or egress hardware - A play structure Although these items do not require a building permit, it is still necessary for these projects to comply with Building Code and Zoning requirements and Sask 1st Call. Development Services Officer dso@rmbritannia.com 306-825-2610