Building permits — Rural Municipality of Canwood No. 494, Saskatchewan

Do I need a building permit? What does it cost?

In the Rural Municipality of Canwood No. 494, Saskatchewan, building permit rules are set by Building Bylaw No. 2020-02, verified 2026-09-27. Permit required for: Work regulated by the Act and Regulations; construct, erect, place, alter, repair, renovate or reconstruct a building; demolition or removal. Permit fees: An administration fee of $50.00 per permit plus $2.00 per $1,000.00 estimated value of construction in excess of $50,000.00. Administered by: Local Authority or its Authorized Representative; building official.

Building Bylaw No. 2020-02 adopted bylaw
permit required for Work regulated by the Act and Regulations; construct, erect, place, alter, repair, renovate or reconstruct a building; demolition or removal. s. 4(1); s. 5(1); s. 6(2)(a)-(b)
exemptions No building, demolition or removal permit required for any building with floor area less than 10 square meters, if no hazard and not used for residential occupancy. s. 4(2)
fee basis An administration fee of $50.00 per permit plus $2.00 per $1,000.00 estimated value of construction in excess of $50,000.00. s. 5(6)(a)
authority Local Authority or its Authorized Representative; building official. s. 2(3); s. 5(3)-(5)
scout note

Adopted building bylaw of the RM of Canwood No. 494 (Bylaw 2020-02) respecting buildings.

Machine-readable: building-permits.json · Official website: https://rmofcanwood.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities