Building permits — Rural Municipality of Corman Park No. 344, Saskatchewan
Do I need a building permit? What does it cost?
In the Rural Municipality of Corman Park No. 344, Saskatchewan, building permit rules are set by Building Bylaw 30-12, verified 2026-09-27. Permit required for: Work regulated by the Act and Regulations; construct, erect, place, alter, repair, renovate or reconstruct a building. Permit fees: $5.00 per $1,000 of value of construction; minimum $100; moved-in buildings $250 pre-move inspection fee in addition. Administered by: Local authority (R.M. of Corman Park No. 344) or its authorized representative/building official.
Building Bylaw 30-12
adopted bylaw
permit required for
Work regulated by the Act and Regulations; construct, erect, place, alter, repair, renovate or reconstruct a building.
s. 4.0(1); s. 5.0(1)
fee basis
$5.00 per $1,000 of value of construction; minimum $100; moved-in buildings $250 pre-move inspection fee in addition.
s. 5.0(5)(a)(i)-(ii)
authority
Local authority (R.M. of Corman Park No. 344) or its authorized representative/building official.
s. 2.0(3)-(4)
scout note
Adopted building bylaw of the RM of Corman Park No. 344 (Bylaw 30/12) respecting buildings.