{
 "answer": "In the Rural Municipality of Craik No. 222, Saskatchewan, building permit rules are set by Building Bylaw (Bylaw No. 2023-08), verified 2026-09-27. Permit required for: All work within the local authority; retaining walls >600 mm differential grade on non-agricultural lands. Permit fees: VOC' × $ / $1,000; residential administration fees per Schedule A; minimum fees per Schedule B; additional $160.00 per additional 40 m'. Fees set in: fee bylaw adopted pursuant to subsection 17(3) of the CC act.",
 "municipality_id": "gx-000903",
 "municipality": "Rural Municipality of Craik No. 222",
 "status_type": "Rural Municipality",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "https://rmcraik222.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building Bylaw (Bylaw No. 2023-08)",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://rmcraik222.ca/mrws/filedriver/Bylaws/No._2023-08_-_Building.pdf",
   "summary": "RM of Craik No. 222 Building Bylaw providing for administration and enforcement of The Construction Codes Act and National Building Code within the local authority.",
   "capture_sha256": "677421eeb497a17167bca51b24ae06846a8656ca90226e3c0e6617bafba945cf",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "2023-08",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/677421eeb497a17167bca51b24ae06846a8656ca90226e3c0e6617bafba945cf.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "All work within the local authority; retaining walls >600 mm differential grade on non-agricultural lands.",
    "exemptions": "Accessory buildings not greater than 10 m2 (no hazard, no sleeping accommodations); decks under 600 mm on residential lands; farm buildings meeting definition (no residential occupancy).",
    "fee_basis": "VOC' × $ / $1,000; residential administration fees per Schedule A; minimum fees per Schedule B; additional $160.00 per additional 40 m'.",
    "fees_location": "fee bylaw adopted pursuant to subsection 17(3) of the CC act",
    "authority": "Building Official; local authority (Rural Municipality of Craik No. 222)"
   },
   "fact_citations": {
    "permit_required_for": "s. 4(1); s. 6(1)(b); s. 7(2)",
    "exemptions": "s. 4(4); s. 4(5); s. 6(2)",
    "fee_basis": "Schedule \"B\"; Schedule \"A\"; s. 5(1)",
    "fees_location": "Appendix \"B\"",
    "authority": "s. 3(3); s. 8(5); s. 8(6)"
   },
   "transcript_url": "/ca/sk/rural-municipality-of-craik-no-222/building-permits/bylaw-2023-08/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/sk/rural-municipality-of-craik-no-222/building-permits/"
}