Building permits — Rural Municipality of Excel No. 71, Saskatchewan

Do I need a building permit? What does it cost?

In the Rural Municipality of Excel No. 71, Saskatchewan, building permit rules are set by Building Bylaw 3-2023, verified 2026-09-27. Fees set in: Schedule A and Schedule B. Administered by: Local authority or its building official.

Building Bylaw 3-2023 adopted bylaw
permit required for All work as defined: design, construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, occupancy or change of occupancy, or reconstruction of a building. s. 3.1; s. 6.1(b)
exemptions Accessory buildings not greater than 10 m² (no hazard, no sleeping accommodations); decks under 600 mm differential grade height on residential land; farm buildings meeting definition (no residential occupancy). s. 4.4; s. 4.5; s. 6.2
fee basis Determined by the local authority; may include administration fee, deposit, service fee, SAMA fee, and applicable taxes; building official may establish value of construction. s. 5.1; s. 5.7
fees location Schedule A and Schedule B Schedule "A"; Schedule "B"
authority Local authority or its building official s. 3.1(b); s. 8.5; s. 8.6
scout note

Adopted building bylaw administering The Construction Codes Act and National Building Code within the R.M. of Excel No. 71.

Machine-readable: building-permits.json · Official website: https://rm71.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities