Building permits — Rural Municipality of Garden River No. 490, Saskatchewan

Do I need a building permit? What does it cost?

In the Rural Municipality of Garden River No. 490, Saskatchewan, building permit rules are set by Building Bylaw, verified 2026-09-27. Permit required for: A permit is required whenever work regulated by the Act and Regulations is to be undertaken. Exemptions: Farm buildings; accessory building not greater than 10 m2(108 ft) provided it does not create a hazard.

Building Bylaw adopted bylaw
permit required for A permit is required whenever work regulated by the Act and Regulations is to be undertaken. s. 4(1)
exemptions Farm buildings; accessory building not greater than 10 m2(108 ft) provided it does not create a hazard. s. 3(4); s. 3(5)
fee basis Permit administration fee plus service fees for plan review, field inspection and enforcement, plus Saskatchewan Assessment Management Agency maintenance fee(s); demolition/removal permit fee $50.00. s. 5(5); s. 6(1)
authority Local authority or its authorized representative; plan review/inspection may be by building officials designated by the minister or contracted person/firm/corporation. s. 2(3); s. 5(2); s. 5(3); s. 5(4)
scout note

Building bylaw on the RM's own official site; PDF not openable (captcha-walled).

Machine-readable: building-permits.json · Official website: https://rmgardenriver.com/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities