| permit required for | Work on buildings greater than 10 m2, as defined: design, construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, change of use, occupancy or change of occupancy. | "Work must not commence before a permit is issued"; "“work” means any design, construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, change of use, occupancy or change of occupancy" |
| exemptions | Bylaw applies only to buildings greater than 10 m2 (107.6 ft2) in building area, except as otherwise exempted by the Act or the regulations. | "The provisions of this building bylaw apply to buildings greater than 10m? (107.6 ft2) in building area except as otherwise exempted by the Act or the regulations" |
| fee basis | Sum of: permit administration fee (listed in a fee bylaw); plan review, field inspection and enforcement fees (per a fee bylaw or the building official services agreement); SAMA fees; and a deposit if required. | "The permit fee shall be calculated according to the sum of the following"; "the fees charged by the Saskatchewan Assessment Management Agency"; "a deposit, if required, in an amount determined by the local authority" |
| fees location | A fee bylaw, or the agreement between the provider of building official services and the local authority | "a permit administration fee listed in a fee bylaw"; "in accordance with a fee bylaw or the agreement between the provider of building official services and the local authority" |
| authority | Building official; local authority | "Every permit application shall be reviewed and approved by the building official including plan review and approval"; "the local authority or the building official shall, on receipt of the required fee, issue a permit" |
scout note
Building Bylaw No. 24-1 of the Rural Municipality of Heart's Hill No. 352 respecting buildings under The Construction Codes Act / National Building Code; read a third time and adopted March 2024.