{
 "answer": "In the Rural Municipality of Laird No. 404, Saskatchewan, building permit rules are set by Bylaw No. 2019-02 Building Bylaw, verified 2026-09-27. Permit required for: Work regulated by the Act and Regulations, including construction, erection, placement, alteration, repair, renovation or reconstruction of a building. Exemptions: An accessory building not greater than 10 m2 (108 ft2) is exempt from this bylaw provided it does not create a hazard. Permit fees: Based on the Fee Schedule A with an additional 20% RM Administration fee.",
 "municipality_id": "gx-000981",
 "municipality": "Rural Municipality of Laird No. 404",
 "status_type": "Rural Municipality",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "https://rmoflaird.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Bylaw No. 2019-02 Building Bylaw",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://rmoflaird.ca/PDFs/Bylaws/Bylaw-No-02-2019-Building-Bylaw.pdf",
   "summary": "Adopted building bylaw of the RM of Laird No. 404 administering the Uniform Building and Accessibility Standards Act.",
   "capture_sha256": "28cef04a17e9b8d526b0c94ea411620adcb6a343f827c4e087c513542fc21970",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "2019-02",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/28cef04a17e9b8d526b0c94ea411620adcb6a343f827c4e087c513542fc21970.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Work regulated by the Act and Regulations, including construction, erection, placement, alteration, repair, renovation or reconstruction of a building.",
    "exemptions": "An accessory building not greater than 10 m2 (108 ft2) is exempt from this bylaw provided it does not create a hazard.",
    "fee_basis": "Based on the Fee Schedule A with an additional 20% RM Administration fee.",
    "authority": "Local authority or its authorized representative; building officials may provide plan review and inspection."
   },
   "fact_citations": {
    "permit_required_for": "s. 4(a); s. 5(a)",
    "exemptions": "s. 3(f)",
    "fee_basis": "s. 6",
    "authority": "s. 2(c); s. 5(d)"
   },
   "transcript_url": "/ca/sk/rural-municipality-of-laird-no-404/building-permits/bylaw-2019-02/",
   "transcript_quality": "exact"
  }
 ],
 "source": "https://govanswers.org/ca/sk/rural-municipality-of-laird-no-404/building-permits/"
}