Building permits — Rural Municipality of Lipton No. 217, Saskatchewan

Do I need a building permit? What does it cost?

In the Rural Municipality of Lipton No. 217, Saskatchewan, building permit rules are set by Building Bylaw No. 2023-01, verified 2026-09-27. Permit fees: $50.00 per permit plus $2.00 per $1,000.00 estimated value of construction in excess of $50,000.00. Administered by: Local authority or its building official.

Building Bylaw No. 2023-01 adopted bylaw
permit required for Construction, erection, placement, alteration, repair, renovation or reconstruction of a building; retaining walls >600 mm differential grade on lands not used for agricultural purposes. s. 5(1); 'Permits will be required for retaining walls attached to a structure'
exemptions Accessory buildings not greater than 10 m2 (does not create a hazard, no sleeping accommodations); farm buildings; decks under 600 mm differential grade on residential lands. s. 4(4); s. 4(5); s. 4(7)
fee basis $50.00 per permit plus $2.00 per $1,000.00 estimated value of construction in excess of $50,000.00. s. 5(1)(a)
authority Local authority or its building official. s. 3(12); 'reviewed and approved by the building official'
scout note

Adopted building bylaw of the R.M. of Lipton No. 217 providing for administration and enforcement of the National Building Code and Saskatchewan construction standards.

Machine-readable: building-permits.json · Official website: https://rm217.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities