Building permits — Rural Municipality of Milden No. 286, Saskatchewan

Do I need a building permit? What does it cost?

In the Rural Municipality of Milden No. 286, Saskatchewan, building permit rules are set by Bylaw 2022-01 A Bylaw Respecting Buildings, verified 2026-09-27. Permit required for: Work must not commence before a permit is issued. Exemptions: Buildings 10 m2 or less; farm buildings; minor alterations, regular maintenance and repairs not changing structure. Fees set in: Schedule "A" attached to the Building Bylaw.

Bylaw 2022-01 A Bylaw Respecting Buildings adopted bylaw
permit required for Work must not commence before a permit is issued. s. 6(6)
exemptions Buildings 10 m2 or less; farm buildings; minor alterations, regular maintenance and repairs not changing structure. s. 4(2), 4(3), 4(4)
fee basis Inspection fees based on fee per $1,000 of value of construction; $600 minimum under $120,000; $5.00/$1,000 for $120,000-$150,000; $4.00/$1,000 over $150,000; plus travel $200/trip. Schedule "A"
fees location Schedule "A" attached to the Building Bylaw s. 6(7)
authority Building Official s. 6(2)
scout note

Adopted Building Bylaw No. 2022-01 of the R.M. of Milden No. 286 under The Construction Codes Act, adopting the National Building/Energy Codes. Confirmed via OCR.

Machine-readable: building-permits.json · Official website: https://rmofmilden.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities