{
 "answer": "In the Rural Municipality of Milton No. 292, Saskatchewan, building permit rules are set by Bylaw 2025-01 A Bylaw Respecting Buildings and 1 other bylaw, verified 2026-09-27. Permit required for: Work must not commence before a permit is issued. Permit fees: Sum of permit administration fee, plan review/field inspection/enforcement fees, SAMA fees, and any required deposit. Fees set in: Building Permit Fee Bylaw; fee bylaw or agreement between provider of building official services and local authority.",
 "municipality_id": "gx-001023",
 "municipality": "Rural Municipality of Milton No. 292",
 "status_type": "Rural Municipality",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "https://www.rmofmilton.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Bylaw 2025-01 A Bylaw Respecting Buildings",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://www.rmofmilton.ca/wp-content/uploads/2025/07/Bylaw-2025-01-A-Bylaw-Respecting-Buildings_Redacted.pdf",
   "summary": "Adopted Building Bylaw No. 2025-01 of the R.M. of Milton No. 292 under The Construction Codes Act, adopting the National Building/Energy Codes. Confirmed via OCR.",
   "capture_sha256": "c5f1f36d16cc76a2dd176c1582e1818831d9a570cf4f2045a187749ebbd3ada8",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "2025-01",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/c5f1f36d16cc76a2dd176c1582e1818831d9a570cf4f2045a187749ebbd3ada8.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Work must not commence before a permit is issued.",
    "fee_basis": "Sum of permit administration fee, plan review/field inspection/enforcement fees, SAMA fees, and any required deposit.",
    "fees_location": "Building Permit Fee Bylaw; fee bylaw or agreement between provider of building official services and local authority.",
    "authority": "Building Official and local authority."
   },
   "fact_citations": {
    "permit_required_for": "s. 6(6)",
    "fee_basis": "s. 6(7)",
    "fees_location": "s. 6(7)(a)-(b)",
    "authority": "s. 6(2)-(3)"
   },
   "transcript_url": "/ca/sk/rural-municipality-of-milton-no-292/building-permits/bylaw-2025-01/",
   "transcript_quality": "ocr"
  },
  {
   "primary": true,
   "is_official": true,
   "title": "Bylaw 2025-02 Building Permit Service Fees",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://www.rmofmilton.ca/wp-content/uploads/2025/07/Bylaw-2025-02-A-Bylaw-to-Establish-Fee-for-Buliding-Permit-Services_Redacted.pdf",
   "summary": "Adopted Bylaw No. 2025-02 of the R.M. of Milton No. 292 establishing fees for building permit services. Confirmed via OCR.",
   "capture_sha256": "61fea74678db5a6482243053bc06eea5594e1cba983043c383ce76dc20f3773b",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "2025-02",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/61fea74678db5a6482243053bc06eea5594e1cba983043c383ce76dc20f3773b.pdf",
   "link_dead": false,
   "transcript_url": "/ca/sk/rural-municipality-of-milton-no-292/building-permits/bylaw-2025-02/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/sk/rural-municipality-of-milton-no-292/building-permits/"
}