Building permits — Rural Municipality of Winslow No. 319, Saskatchewan
Do I need a building permit? What does it cost?
In the Rural Municipality of Winslow No. 319, Saskatchewan, building permit rules are set by Building Bylaw No. 1-2022 and 1 other bylaw, verified 2026-09-27. Permit required for: Work must not commence before a permit is issued. Permit fees: sum of: permit administration fee; plan review, field inspection and enforcement fees; SAMA fees; deposit if required. Fees set in: a fee bylaw or the agreement between the provider of building official services and the local authority.
Building Bylaw No. 1-2022
adopted bylaw
permit required for
Work must not commence before a permit is issued.
s. 6(6)
fee basis
sum of: permit administration fee; plan review, field inspection and enforcement fees; SAMA fees; deposit if required
s. 6(7)
fees location
a fee bylaw or the agreement between the provider of building official services and the local authority
s. 6(7)(a)-(b)
authority
local authority or the building official
s. 6(3)
scout note
Building Bylaw of the RM of Winslow No. 319 for administration and enforcement of the National Building Code and Construction Codes Act.
Building Permit Fee Bylaw No. 2-2022
adopted bylaw
fee basis
$3.55 per $1,000 value of construction with a minimum fee of $200
$3.55 per $1,000 value of construction with a minimum fee of $200
authority
building official
inspection of construction and enforcement by the building official
scout note
Bylaw establishing building permit fees in the RM of Winslow No. 319.