Building permits — Sedley, Saskatchewan

Do I need a building permit? What does it cost?

In the Village of Sedley, Saskatchewan, building permit rules are set by Building Bylaw No. 2023-2, verified 2026-09-27. Exemptions: Work exempted by the Act or the regulations. Permit fees: PBI Fee Calculator fee for plan review and field inspection, plus 25% administrative fee, plus SAMA fees, plus deposit if required. Fees set in: PBI Fee Calculator; Saskatchewan Assessment Management Agency.

Building Bylaw No. 2023-2 adopted bylaw
permit required for Work, meaning any construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, occupancy or change of occupancy of a building. s. 3 definition of 'work'; s. 6(6)
exemptions Work exempted by the Act or the regulations. s. 5(4)
fee basis PBI Fee Calculator fee for plan review and field inspection, plus 25% administrative fee, plus SAMA fees, plus deposit if required. s. 6(7)
fees location PBI Fee Calculator; Saskatchewan Assessment Management Agency s. 6(7)(a),(c)
authority Local authority or the building official. s. 6(3)
scout note

Village of Sedley Building Bylaw (administration/enforcement of construction codes). OCR-confirmed jurisdiction.

Machine-readable: building-permits.json · Official website: http://villageofsedley.com/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities