{
 "answer": "In the Town of Shaunavon, Saskatchewan, building permit rules are set by Building Bylaw No. 2022-12, verified 2026-09-27. Permit required for: Work must not commence before a building permit is issued. Exemptions: Buildings 10 m2 or less. Permit fees: Building permit fee is sum of $5.00 administration fee, plan review/inspection/enforcement fees, SAMA fees, and deposit.",
 "municipality_id": "gx-001154",
 "municipality": "Shaunavon",
 "status_type": "Town",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "http://www.shaunavon.com/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building Bylaw No. 2022-12",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://admin.shaunavon.com/assets/f25f1703-f8d6-4d29-bd50-1c3079f37775.pdf",
   "summary": "Town of Shaunavon Building Bylaw (administration/enforcement of construction codes). OCR-confirmed jurisdiction.",
   "capture_sha256": "019678a5f0357ce4df494cff43ad4dd7bf1e179fa2bc44f329335ba13c20e7b6",
   "captured_at": "2026-06-13T16:33:18+00:00",
   "capture_http_status": 200,
   "document_number": "2022-12",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/019678a5f0357ce4df494cff43ad4dd7bf1e179fa2bc44f329335ba13c20e7b6.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Work must not commence before a building permit is issued.",
    "exemptions": "Buildings 10 m2 or less.",
    "fee_basis": "Building permit fee is sum of $5.00 administration fee, plan review/inspection/enforcement fees, SAMA fees, and deposit.",
    "fees_location": "a fee bylaw or the agreement between the provider of building official services and the local authority",
    "authority": "Building official or local authority."
   },
   "fact_citations": {
    "permit_required_for": "s. 6(7)",
    "exemptions": "s. 5(4)(c)",
    "fee_basis": "s. 6(8)",
    "fees_location": "s. 6(8)(b)",
    "authority": "s. 6(3); s. 6(4); s. 11"
   },
   "transcript_url": "/ca/sk/shaunavon/building-permits/bylaw-2022-12/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/sk/shaunavon/building-permits/"
}