{
 "answer": "In the Village of Waseca, Saskatchewan, building permit rules are set by Building Bylaw No. GOVSK 1-2024, verified 2026-09-27. Permit fees: Sum of permit administration fee, plan review/field inspection/enforcement fees, SAMA fees, and any deposit. Fees set in: a fee bylaw or the agreement between the provider of building official services and the local authority. Administered by: local authority or the building official.",
 "municipality_id": "gx-001223",
 "municipality": "Waseca",
 "status_type": "Village",
 "jurisdiction": "Saskatchewan",
 "country": "CA",
 "topic": "building_permits",
 "label": "Building permits",
 "status": "found",
 "last_verified": "2026-09-27",
 "official_website": "https://wasecasask.ca/",
 "documents": [
  {
   "primary": true,
   "is_official": true,
   "title": "Building Bylaw No. GOVSK 1-2024",
   "category": "building_permits",
   "document_type": "bylaw",
   "status": "adopted",
   "adopted_date": null,
   "document_url": "https://wasecasask.ca/wp-content/uploads/2026/08/Building-Bylaw.pdf",
   "summary": "Province's model Building Bylaw (GOVSK 1-2024), deemed adopted under section 18 of The Construction Codes Act; provides for permits, plan review, inspections and enforcement per the National Building/Energy Codes; repeals all previous building bylaws. Approved by the Ministry of Government Relations, Building and Technical Standards, January 2024.",
   "discovered_by": "sk-building",
   "discovered_at": "2026-09-24",
   "capture_sha256": "a1c40a9d817b28c9c8985d7982171252ad9d1ba471b84140a90e28af3ef156d6",
   "captured_at": "2026-09-25T02:37:39+00:00",
   "capture_http_status": 200,
   "document_number": "1-2024",
   "snapshot_url": "https://pub-e61c5ee2a8704225bfa8de0c280e8a2c.r2.dev/bylaws/a1c40a9d817b28c9c8985d7982171252ad9d1ba471b84140a90e28af3ef156d6.pdf",
   "link_dead": false,
   "facts": {
    "permit_required_for": "Any design, construction, addition, erection, placement, alteration, repair, renovation, demolition, relocation, removal, use, change of use, occupancy or change of occupancy of a building.",
    "fee_basis": "Sum of permit administration fee, plan review/field inspection/enforcement fees, SAMA fees, and any deposit.",
    "fees_location": "a fee bylaw or the agreement between the provider of building official services and the local authority",
    "authority": "local authority or the building official"
   },
   "fact_citations": {
    "permit_required_for": "s. 3, definition of \"work\"",
    "fee_basis": "s. 6(7)",
    "fees_location": "s. 6(7)(a)-(b)",
    "authority": "s. 6(2)-(3)"
   },
   "transcript_url": "/ca/sk/waseca/building-permits/bylaw-1-2024/",
   "transcript_quality": "ocr"
  }
 ],
 "source": "https://govanswers.org/ca/sk/waseca/building-permits/"
}