Building permits — Taylor, British Columbia

Do I need a building permit? What does it cost?

In the District Municipality of Taylor, British Columbia, building permit rules are set by Building Bylaw 391-1991, verified 2026-08-28. Permit required for: Construction of any building or structure or part thereof, including swimming pools, signs over 3 metres, and building moves. Exemptions: Buildings or structures not exceeding 15 square metres, temporary on-site trailers for valid projects, and repainting exterior or interior surfaces. Permit fees: Schedule B: $25 up to $5,000 value; $5 per $1,000 up to $50,000; $3 per $1,000 over $50,000.

Building Bylaw 391-1991 adopted bylaw
permit required for Construction of any building or structure or part thereof, including swimming pools, signs over 3 metres, and building moves. s. 2.2, s. 5.1.2, s. 10.1(a)
exemptions Buildings or structures not exceeding 15 square metres, temporary on-site trailers for valid projects, and repainting exterior or interior surfaces. s. 5.1.2(a)(b), s. 1.3
fee basis Schedule B: $25 up to $5,000 value; $5 per $1,000 up to $50,000; $3 per $1,000 over $50,000. Schedule B
authority Building Inspector s. 3.1
fine range Not more than $2,000.00 in addition to the costs of the prosecution. s. 11.2
scout note

Taylor Building Bylaw 391 (1991) regulating building construction, permits, and standards within the district.

Machine-readable: building-permits.json · Official website: http://www.districtoftaylor.com/ · Last verified 2026-08-28 · Building permits across British Columbia · Building permits in other municipalities