| permit required for | location, placement, erection or construction; addition, extension, improvement, alteration or conversion; underpinning; relocation or removal; mechanical system; special process; plumbing connection; excavation | s. 4.2.1.1 |
| exemptions | patching, painting, decorating; replacement of stucco/siding/shingles; doors/windows if opening not altered; open landing/stairs; fences; cabinets/shelves; detached accessory storage building not greater than 13.9 m2; non-structural work less than $15,000 | s. 4.2.1.2 |
| fee basis | Part 9 one/two family: 1.25% first $100,000, 0.75% remainder; values by sqft rates (e.g. main floor $45.00/sqft); Part 3/Part 9 commercial: 1.0% on first 1,000,000, 0.6% remainder, $200 minimum | Schedule "A" |
| fees location | MLA Planning Region / current MLA Fee Schedule | s. 4.1.1(c); Schedule "A" note |
| authority | Mossey River Municipality; building inspector, designated officer or other appointed authority | s. 2.2.3 "Authority Having Jurisdiction"; s. 5.3.1 |
| fine range | not exceeding $5,000.00; Schedule A: double fees for permit after work commenced; $100.00 for development permit after commencement | s. 7.2; Schedule "A" |
scout note
Adopts the Manitoba Building Code across the whole municipality; requires building, plumbing, occupancy and demolition permits; sets owner/constructor/inspector duties, appeal process, offences and a permit-fee schedule (Schedule A).