| permit required for | Construct or demolish a building, carry out plumbing, change use, construct/repair/renew/alter signage, or obtain partial/conditional/occupancy permits as set out. | s. 5(a)-(f) |
| exemptions | Mining extraction structures, underground structures including fuel tanks, sheds less than 108 ft2, residential shingling (including metal roofs); home occupation/profession signage; certain plumbing maintenance/repairs. | s. 5(a); s. 5(e); Schedule "F", s. 1.1.1 |
| fee basis | Fees payable in accordance with the Fee By-Law; where based on valuation, valuation includes total cost of all work regulated by permit. | s. 13 |
| fees location | Fee By-Law, as amended | s. 13; s. 21(b) |
| authority | Chief Building Official and Inspectors | s. 5(a); s. 18; s. 23 |
scout note
Town's Building By-law under Building Code Act s.7: regulates construction/demolition/change-of-use permits, classes of permits, permit fee schedule, doubling of fees for work started without a permit, and inspections.