THE CORPORATION OF THE TOWN OF IROQUOIS FALLS
BY-LAW NO. 3564/19
"Being a by-law to regulate construction, demolition,
change of
use, inspections and related matters. "
WHEREAS
Section 7 of the Building Code Act, 1992, S.O. 1992, Chapter 23,
empowers Council to pass certain by-laws respecting construction,
demolition, change of use, permits, inspections and related matters;
AND WHEREAS
Council for The Corporation of the Town of Iroquois Falls deems it
necessary to enact such a by-law.
NOW THEREFORE, COUNCIL FOR THE CORPORATION OF THE TOWN OF
IROQUOIS FALLS ENACTS AS FOLLOWS:
1.
CONFLICT WITH BY-LAWS
In the event of any conflict between the terms and provisions of this by-law and the terms
and provisions of By-Law No. 2179/83; the terms and provisions of this by-law will
prevail, with the exception of Section 11. (4) of By-Law No. 2179/83, as amended.
2.
That this by-law may be cited as the "Building By-Law".
3.
DEFINITIONS
In this by-law,
(a)
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
"Act" means the Building Code Act, 1992, S.O. 1992, Chapter 23
including amendments thereto.
"Applicant" means the owner of a building or property who applies for a
permit or any person authorized by the owner to apply for a permit on the
owner's behalf, or any person or corporation empowered by statute to
cause the construction or demolition of a building or buildings and anyone
acting under the authority of such person or corporation.
"Building Code" means the regulations made under Section 34 of the Act.
"Chief Building Official" means the Chief Building Official appointed by
by-law of the Town of Iroquois Falls for the purposes of enforcement of
the Act.
"Town" means The Corporation of the Town oflroquois Falls.
"Defective Plumbing" means plumbing which at the time of inspection
does not conform to the regulations.
"Finishing" means any plumbing performed after the roughing-in.
"Inspector" means an inspector appointed by by-law by the Corporation
of the Town of Iroquois Falls for the purposes of enforcement of the Act.
"Maintenance" means the repair of plumbing, including the repair of taps
and valves by replacing worn parts but shall not mean or include the
installation, construction, reconstruction, or relocation of plumbing, or
additions thereto.
"Owner" means the registered owner of the property and includes a lessee,
mortgagee in possession, and the authorized agent in lawful control of the
property.
"Permit" means written permission or authorization given in writing from
the Chief Building Official to perform work, to change the use of a
building or part thereof, or to occupy a building or part thereof, as
regulated by the Act and Building Code.
(xii)
"Permit Holder" means the owner to whom a permit has been issued or
where a permit has been transferred, the new owner to whom the permit
has been transferred.
(xiii) "Plumbing" means a drainage system, a venting system and a water
system or parts thereof.
(xiv)
"Plumbing Contractor" means any person performing or hired to
perform for their own use or benefit, or for that of another, with or without
remuneration or gain, any plumbing work within the limits of the Town of
Iroquois Falls.
(xv)
"Registered Code Agency" means a person or entity that has the
qualifications and meets the requirements described in Subsection
15.11(4).
(xvi)
"Valuation of the Proposed Work" means the completed value of all
construction or work related to the building, including finishes, roofing,
electrical, plumbing, drains, heating, air-conditioning, fire extinguishing
systems, elevators and any other equipment and all materials, overhead,
professional and related services, current monetary worth of all
contributed labour and an evaluation of work by own forces.
4.
Any word or terms not defined in this by-law shall have the meaning ascribed to them in
the Act or the Building Code.
5.
CLASSES OF PERMITS - Classes of permits with respect to the construction,
demolition and change of use of buildings shall be as set out below.
a) Building & Demolition Permits
No person shall construct or demolish a building or cause a building to be constructed
or demolished within the geographic limits of the Town of Iroquois Falls unless a
permit has been issued therefore by the Chief Building Official.
No person shall carry out plumbing unless a building permit has been issued by the
Chief Building Official (see Schedule "F").
Exceptions to the above requirement for a building permit include structures required
for mining extraction purposes (e.g., head frames), underground structures including
fuel tanks, sheds less than 108 ft2 in area, and residential shingling (to include metal
roofs).
b) Partial Permit
When in order to expedite work, approval of a portion of the building or project is
desired prior to the issuance of a permit for the complete building or project,
application shall be made and fees paid for the complete project as well as fees
established by by-law for each stage of construction.
Complete plans and
specifications covering the portion of the work for which immediate approval is
desired shall be filed with the Chief Building Official.
Where a permit is issued for part of a building or project, this shall not be construed
to authorize construction beyond the plans for which approval was given nor that
approval will necessarily be granted for the entire building or project and such
applications are at the risk of the applicant.
c) Change of Use Permit
As per Subsection 10(1) of the Act, no person shall change the use of a building or
part of a building ( even though no construction is proposed) that would result in an
increase in hazard as determined under the Building Code unless the Chief Building
Official has issued a permit.
d) Occupancy Permit
The permit holder or authorized agent shall notify the Chief Building Official or his
designate official of the completion of a building for which an occupancy permit is
required as per Section 1.3.3. of Division C of the Ontario Building Code.
e) Sign Permit
No person shall construct, repair, renew, and alter signage unless a permit has been
issued by the Chief Building Official. Signage relating to home occupations and
professions does not require a building permit.
f) Conditional Permit
Council authorizes the authority to issue conditional permits to the Chief Building
Official. This class of permit may be issued at the discretion of the Chief Building
Official to authorize any stage of construction, even though all of the requirements
under Subsection 8(2) of the Act have not been met. However, before issuing such
permits, the requirements of paragraphs 8(3)(a), (b), and (c) of the Act must be
complied with.
6.
REVISION TO PERMIT
After the issuance of a permit under the Act, notice of any material change to a plan,
specification, document or other information on the basis of which the permit was issued,
must be given in writing to the Chief Building Official together with the details of such
change. Any such change is not to be made without the written authorization of the Chief
Building Official.
7.
REVOCATION OF PERMITS
Pursuant to Subsection 8(10) of the Act, the Chief Building Official has the authority to
revoke a building permit. Generally, consideration will be given to revoking a permit, if
in the opinion of the Chief Building Official,
a) the permit was issued prematurely or in error;
b) construction or demolition activity on the site has not commenced within a six ( 6)
month period from the date the permit was issued;
c) construction activity has not proceeded in a meaningful way over a period of twelve
(12) months; and
d) the project has been abandoned by the applicant who has advised so in writing to the
Town.
In the event that the Chief Building Official intends on revoking a permit under
paragraphs b) or c) of this section, the applicant shall be advised in writing of the Chief
Building Official's intention to revoke the permit and the applicant will be afforded an
opportunity to respond in writing as to their intentions to continue with or abandon the
permit. If in the opinion of the Chief Building Official, the response is not reasonable
and/or is not reasonable from a timing perspective, the permit may be revoked.
8.
APPLICATION FOR BUILDING PERMITS
To obtain a permit, the owner or an agent authorized in writing by the owner, shall file an
application in writing by completing a prescribed form available from the Chief Building
Official at the Municipal Office, 253 Main Street, Iroquois Falls, Ontario or from the
Town's website. Application forms prescribed by the Town, under paragraph 7(1)(f) of
the Act, shall be as set out in Schedule "A" to this by-law.
Every application for a building permit shall be submitted to the Chief Building Official
and contain the following information to be completed on the prescribed application
form:
(a) Where application is made for a building permit under Subsection 8(1) of the Act, the
application shall,
(i)
identify and describe in detail the work and occupancy to be covered by
the permit for which application is made;
(ii)
describe the land on which the work is to be done by a description that will
readily identify and locate the building lot;
(iii)
include complete plans and specifications as described in this by-law for
the work to be covered by the permit and show the occupancy of all parts
of the building;
(iv)
state the value of the proposed work including materials and labour and be
accompanied by the required fee;
(v)
state the names, addresses and telephone numbers of the owner, architect
or engineer, where applicable, or other designer or constructor;
(vi)
be accompanied by a signed acknowledgment of the owner on a form
prescribed by the Chief Building Official that an architect or professional
engineer, or both, have been retained to carry out that general review of the
construction or demolition of the building, as described in Division C,
Section 1.2.2. of the Building Code;
(vii)
be accompanied by a signed statement of the architect or professional
engineer, or both, on a form prescribed by the Chief Building Official,
undertaking to provide general review of the construction or demolition of
the building, as described in Division C, Section 1.2.2. of the Building
Code;
(viii) include, where applicable, the registration number of the builder or vender
as provided in the Ontario New Home Warranties Plan Act; and
(vix) be signed by the owner or his or her authorized agent who shall certify the
truth of the contents of the application.
(b)
Where application is made for a demolition permit under Subsection 8(1) of the
Act, the application shall,
(i)
contain the information required by subparagraphs 8.(a)(i) to (vix) of this
section;
(ii)
be accompanied by satisfactory proof that arrangements have been made
with the proper authorities for the cutting off and plugging of all water,
sewer, gas, electric, telephone or other utilities and services; and
the applicant shall,
(iii)
retain a professional engineer to undertake a general review of the project
during demolition if the building meets the criteria as outlined in the
Building Code.
( c)
Where application is made for a change of use permit under Subsection 10(1) of
the Act, the application shall,
(i)
contain the information required by subparagraphs 8.(a)(i) to (vix) of this
section; and
(ii)
describe the building in which the occupancy is to be changed, by a
description that will readily identify and locate the building;
(B)
identify and describe in detail the current and proposed
occupancies of the building or part of a building for which the
application is made;
(C)
include plans and specification which show the current and
proposed occupancy of all parts of the building and which contain
sufficient information and establish compliance with the
requirements of the Building Code, including floor plans, details of
walls, ceilings and roof assemblies identifying required fire
resistance ratings and load bearing capacities, details of the
existing "sewage system", if any;
(D)
be accompanied by the required fee; and
(A)
(E)
state the name, address and telephone number of the owner.
(d)
Where application is made for a conditional permit under Subsection 8(3) of the
Act, the application shall,
(i)
contain the information required by subparagraphs 8.(a)(i) to (vix) of this
section;
(ii)
include complete plans and specifications, documents, and other
information as required by the Building Code and as described in this by-
law for the work to be covered by the permit;
(iii)
state the reasons why the applicant believes that unreasonable delays in
construction would occur if a conditional permit is not granted;
(iv)
state the necessary approvals which must be obtained in respect of the
proposed building and the time in which such approvals will be obtained;
and
(v)
state the time in which plans and specifications of the complete building
will be filed with the Chief Building Officials.
9.
COMPLETE AND INCOMPLETE APPLICATIONS
In order for an application to be considered complete, the applicant must satisfy the
information requirements listed in Section 8 of this by-law.
In addition, permit
applications must be accompanied by the required fee in order to be considered a
complete application.
An application is deemed to be incomplete where the Chief Building Official determines
within two (2) working days that the proposed work or change of use will not comply
with the Act, the Ontario Building Code, or any other applicable law. The Chief Building
Official may refuse an application if anything required by this Section is omitted or
submitted in an incomplete or unsatisfactory state at the time of application and written
statement of reason for the refusal must be provided.
9.1
EXISTING STRUCTURES ERECTED WITHOUT A BUILDING PERMIT
The Chief Building Official will not accept or consider building permit applications for
any existing structures erected without a building permit and that would otherwise require
an occupancy permit. Building permit applications will only be accepted in cases where
the applicant meets all of the requirements of Section 8 and 9 of this by-law.
In cases where the Town becomes aware of any existing structures built without a
building permit and that otherwise would have required an occupancy permit, the Town
shall ensure that any outstanding structural and other life safety items are remedied under
the Town's Property Standards by-law.
Under such circumstances, the Town will not undertake any inspections of the subject
building. The Town shall require the owner to retain a professional engineer and/or
architect to inspect the subject building and to prepare a report assessing the structural
soundness and safety of the subject building to ensure that the structure is in compliance
with the Property Standards By-Law.
The Town may also require a third party peer review be completed for the subject report
at the sole cost of the owner. The Town may then undertake an inspection(s) of the
subject building for the purposes of verifying that any remedial measures recommended
in the report have been completed.
In the event that an Engineer or Architect report identifies remedial measures to be
completed to ensure the safety of the building and its occupants, the owner shall be
required to submit a compete building permit application and to secure any required
building permits prior to any work being undertaken.
The Chief Building Official shall maintain an ongoing database of identified properties
that accommodate existing structures erected without a building permit. The purpose of
this database would be to serve public notice to prospective purchasers or their solicitors
advising of the status of such properties through building code compliance requests and
other property compliance requests and/or inquiries.
Building Code compliance relating to existing structures built without a building permit
and that would otherwise require an occupancy permit will be the sole responsibility of
the affected property owner and may be confirmed through completion of building
reviews by qualified engineers or architects.
To this end, the Town shall not review,
accept or offer any opinions with respect to such reviews and shall not consider or accept
building permit applications in such instances.
10.
EQUIVALENTS
Where an application for a permit or the authorization to make a material change to a
plan, specification, document or other information on the basis of which a permit was
issued, contains an alternative solution, the following documentation shall be provided of
the Chief Building Official:
a) the solution must identify an applicable objective, functional statement and
acceptable solutions;
b) describing a basis for past performance, establish tests of the solutions or other
evaluation of the solution; or
c) any other tests standards that provide comparable results to the recognized
standards in the Ontario Building Code
11.
PLANS AND SPECIFICATIONS
Sufficient plans, specifications, documents and other information including a site plan,
shall be submitted with each application for a permit to enable the Chief Building Official
to determine whether or not the proposed construction, demolition or change of use will
conform with the Act, the Building Code any other applicable law.
Each application shall, unless otherwise specified by the Chief Building Official, be
accompanied by two complete sets of plans and specifications required under this by-law.
Plans shall be drawn to scale on paper, or other suitable and durable material; shall be
legible; and, without limiting the generality of the foregoing, shall include such working
drawings as set out in Schedule "B" to this by-law unless specified by the Chief Building
Official.
In addition, for larger scaled residential developments and for all non-residential
developments, the Chief Building Official will require the submission of "final approved"
drawings as revised as well as "as built" drawings in a format that is compatible with the
Town's preferred software.
12.
THE SITE PLAN
The site plan shall be referenced to an up-to-date survey and when required to
demonstrate compliance with the Act, Building Code or other applicable law, a copy of
the survey shall be submitted to the Chief Building Official. This requirement may be
waived because the Chief Building Official is able, without having a current plan of
survey, to determine whether the proposed work conforms to the Act, the Building Code
and other applicable law.
The Site plan shall show,
a) lot size and the dimensions of the property lines and setbacks to any existing or
proposed buildings;
b) the direction of drainage flow;
c) existing right-of-way, easements and municipal services;
d) dimensions of setbacks of proposed buildings from buildings located on adjacent lots;
and
e) proposed fire access routes and existing fire hydrant locations.
For larger scaled residential developments and for all non-residential developments, the
Chief Building Official will require the submission of "final approved" drawings as
revised as well as "as built" drawings in a format that is compatible with the Town's
preferred software.
13.
PAYMENT OF FEES
Fees payable for a required permit shall be in accordance with the Fee By-Law, as
amended, that is in effect at the time and that are due and payable upon submission of an
application for a permit when received by the Chief Building Official. Applications shall
not be considered complete until associated fees are paid in full.
No permit shall be issued until the fees have been paid in full.
Where the fees payable in respect of an application for a construction or demolition
permit issued under Subsection 8(1) and 8(3) of the Act are based on the valuation of the
proposed work, the valuation shall include the total cost of all work regulated by the
permit including the cost of all material, labour, equipment, overhead and professional
and related services.
The valuation of the proposed work, as defined under subparagraph 3(a)(xvi) of this by-
law, shall not include provisions for site work not specifically relating to the building(s)
( e.g., landscaping, walkways, driveways, curbing, and the like).
For residential development that is typically undertaken and/or managed by the owner of
the proposed development, or in cases where reasonable costing is difficult to determine,
the following table will be used to arrive at the value of construction. It is noted that
these values may be adjusted annually based on a cost of living index at the discretion of
the Chief Building Official.
A- Assembly (Group A) value of construction:
New Construction
$ 280/ft2
Renovations/Tenant Fit ll£
$ 180/ft2
B- Institutional (Group B) value of construction:
New Construction
$ 300/ft2
Renovations/Tenant Fit up
$ 180/ft2
C- Residential (Group C) value of construction:
Ground Floor
$ 180/ft2
Second Floor
$ 120/ft2
Attached Garage
$ 80/ft2
Finished Basement
$ 40/ft2
Garage
$ 50/ft2
New Mobile Home
$ Cost + $ 30/ft2
Mobile Home Installation ONLY
$ 30/ft2
Shed/ Carport/ Accessory Structures
$ 40/ft2
Decks
$ 20/ft2
D- Office and Personal Services (Group D) value of construction:
New Construction
$ 230/ft2
Renovations/Tenant Fit ll£
$ 115/ft2
E- Mercantile (Group E) value of construction:
New Construction
$ 200/ft2
Renovations/Tenant Fit llf)
$ 100/ft2
F- Industrial (Group F) value of construction:
New Construction
$ 150/ft2
Renovations/Tenant Fit ll£
$ 75/ft2
G- Other Additional Structures:
Farm Buildings
$ 80/ft2
Tents and Air Support Structures
$ 60/ft2
Storage Buildings
$ 70/ft2
Storage or Sea Containers
$ Cost + Installation
Stages
$150 FF
14.
DISPUTES OVER FEES
The Chief Building Official may place a valuation on the cost of the proposed work for
the purposes of establishing the permit fee or for the purposes of establishing the
valuation for statistical purposes. Where disputed by the applicant, the applicant shall
pay the required fee under protest and within six ( 6) months of completion of the project
shall submit an audited statement of the actual costs, and where the audited costs are
determined to be less than the valuation, the Chief Building Official shall issue a refund
and correct the application.
15.
DOUBLING OF PERMIT FEES
The Chief Building Official has the discretion to double the value of building permit fees
for any class of permits if construction has commenced prior to the issuance of permit in
order to recover the Town's additional costs for such matters. Generally, this provision
will be used in cases where individuals have been known to commence construction
without a building permit in the past and not for first time offenders.
16.
REFUNDS
In the case of withdrawal of an application or the abandonment of all or a portion of the
work or the non-commencement of any project for which the permit fee is greater than
one hundred dollars ($100.00), the Chief Building Official shall determine the percentage
of fee eligible for a refund, if any, in accordance with Schedule "C" attached to and
forming part of this by-law.
17.
CHANGING PERMIT FEES
The requirements for holding a public meeting and the justification for a fee change shall
be completed in compliance with the Act and Building Code prior to any adjustments
occurring to a building permit fee.
18.
PRESCRIBED AND ADDITIONAL NOTICE REQUIREMENTS FOR INSPECTIONS
The owner or an authorized agent shall notify the Chief Building Official or an inspector
at least forty-eight ( 48) hours prior to each stage of construction for which notice in
advance is required under Division C, Section 1.3.5 of the Building Code, for prescribed
notices, and for additional notices as set out in Schedule "D", back of owners building
permit application.
19.
PRESCRIBED APPLICATION AND OTHER FORMS
The forms prescribed for use as permit applications, permits, orders and inspection
reports shall be as set out in Schedule "A" to this by-law.
20.
AS CONSTRUCTED PLANS
The Chief Building Official may require that a set of "as constructed" plans of a building
or any class of buildings in hard copy and digital format compatible with the Town's
preferred software be filed with the Chief Building Official on completion of construction
under such conditions as may be prescribed in the Building Code.
21.
TRANSFER OF PERMIT
(a) If the registered owner of the land to which the permit applies changes, the permit is
transferable only upon the new owner completing a permit application, as per the
requirements of Section 8 of this by-law. The new owner shall then be the permit
holder for purposes of the Act and the Building Code and assume all responsibilities
for compliance with the permit documents.
(b) The fee for transferring a permit shall be as set out in the Town's fee by-law, as
amended.
23.
CODE OF CONDUCT & CONFLICT OF INTEREST
The Chief Building Official, Inspectors and Administrative supportive staff shall adhere
to the Town of Iroquois Falls' Code of Conduct.
Furthermore, the Chief Building
Official, Senior Building Inspector and Building Inspectors shall adhere to the Conflict of
Interest Policy as set out in Schedule "E".
24.
CONSTRUCTION/DEMOLITION FENCES
A person issued a construction or demolition permit under the Act for any work in the
Town of Iroquois Falls shall submit fencing details ( extent of fencing, height, description
of fencing materials, location of openings and gates, etc.) and erect and maintain a
temporary fence to enclose the construction or demolition site, including any areas where
equipment is operated or equipment or material is stored. The Chief Building Official
may grant an exemption from the requirement to erect and maintain a fence if satisfied
that conditions at a site would not present a particular hazard to the public after having
regard for the following parameters:
a) The proximity of the site to occupied dwellings;
b) The proximity of the site to places frequented by the public, including streets, parks,
businesses and workplaces;
c) The effectiveness of any existing fencing adjacent to the site;
d) The feasibility and effectiveness of fencing the site;
e) Any proposed security measures to deter entry to the site;
f) The hazard presented by the activity occurring and materials used on the site;
g) The expected duration of the hazard; and
h) Any other safety considerations.
Where work on a construction or demolition site is substantially suspended or abandoned,
the Chief Building Official may revoke an exemption granted under this Subsection by
serving written notice of the revocation on the permit holder.
25.
MINE HAZARDS
In cases where a building permit application has been submitted involving a property
where mining operations may have affected the structural stability of the ground, a
comprehensive report must be completed and stamped by a professional engineer (to be
secured by the applicant) competent in the mining/geotechnical/rock mechanics field will
be required as part of satisfying a complete application.
The purpose of the study is to demonstrate whether or not the rock mass conditions are
appropriate and stable to accommodate the intended development over the long term.
Applicants will be directed to the Ministry of Northern Development and Mines
(MNDM) for review and approval of such reports. MNDM's approval must be submitted
to the Chief Building Official as part of a complete building permit application.
In addition, prior to a building permit being issued and the commencement of
construction, the Chief Building Official will require a stamped letter by the said
professional engineer retained by the applicant certifying that the any remedial work has
been completed, inspected and is in compliance with the said engineering report.
26.
DRAINAGE & LOT GRADING
A final inspection may not be conducted until such time as the applicant has
demonstrated, to the satisfaction of the Town that their property meets the approved lot
drainage and grading plan that has been completed in conjunction with the registered
subdivision.
In cases where an approved and registered lot drainage and grading plan does not exist for
a lot (e.g., infill lots), the applicant will be required to complete a lot drainage and
grading plan to the satisfaction of the Town before the building permit is issued. A final
inspection may not be conducted until such time as the applicant has demonstrated, to the
satisfaction of the Chief Building Official or Inspector, that their property meets the
approved lot drainage and grading plan that has been approved by the Town.
27.
ANNUAL REPORTS & PERFORMANCE MEASURES
The Chief Building Official shall complete monthly reports concerning building permit
activity associated with the administration of the Act and Building Code. Reports shall
include a summary of performance measures to ensure that services are being delivered in
accordance with the requirements of the Act and Building Code.
The Administration department shall include in its monthly departmental report the
revenues and costs associated with building permit activity.
28.
ISSUING ORDERS
The Chief Building Official and Inspectors shall apply "people skills" in dealing with
situations that may require an order to be issued.
As such, each situation must be
approached with a degree of caution, calm, fairness, firmness and reasonableness.
Generally, orders should be issued in more serious cases.
Wherever possible, the
issuance of orders relating to more minor infractions should be avoided. Generally, the
following progressive approach will be adopted by the Chief Building Official and
Inspectors in dealing with situations that may result in the issuance of an order:
a) Verbal Persuasion - depending upon the severity of the matter, persuasion in person
or by telephone should be used before an order is made and served. In cases were
verbal persuasion is used, staff shall document this communication.
b) Correspondence - a letter forwarded to the offender, encouraging and requesting
compliance and demanding a written reply and compliance before a given date. An
inspection report should also be provided to the offender documenting the nature of
the offence.
c) Issuance of
the Order - used as a last resort for minor offences and may be the first
line of action for more serious infractions.
Despite the above, there may be circumstances where even minor infractions are dealt
with immediately by the issuance of an order, such as, in cases where an individual or
company has a history of repeated infractions. In cases involving unsafe conditions or
emergency situations, the immediate issuance of an order would also be considered
appropriate action.
29.
RESCINDING ORDERS
The Chief Building Official has the authority to rescind any order made by the Chief
Building Official or by any Inspector. Orders may be rescinded at the discretion of the
Chief Building Official and will be provided in writing. The following will be considered
by the Chief Building Official before rescinding an order:
a) In cases where the Chief Building Official is of the opinion that the intent and spirit of
the policy for issuance of an order outlined Section 27 of this by-law was not met; and
b) In cases where an order was made in error or based on incomplete information and/or
knowledge of the situation.
30.
LEGAL ENFORCEMENT PROCEEDINGS
In enforcing the Act, the Chief Building Official and Inspectors shall generally follow the
spirit and intent of the principles and progressive procedure for the issuing of orders
established in Section 27 of this by-law. These steps include:
a) Verbal Persuasion - depending upon the severity of the matter, persuasion in person
or by telephone should be used before formal legal proceedings are considered. In
cases were verbal persuasion is used, staff shall document this communication.
b) Correspondence a letter forwarded to the offender, encouraging and requesting
compliance and demanding a written reply and compliance before a given date.
c) Commencement of
Legal Proceedings - Will include either the issuance of tickets
under the Provincial Offences Act for more minor infractions or through the
Provincial Court System for more significant offences.
Despite the above, there may be circumstances where even minor infractions are dealt
with immediately through the commencement of legal proceedings, such as, in cases
where an individual or company has a history of repeated infractions.
31.
USE OF REGISTERED CODE AGENCIES
The Chief Building Official is authorized to enter into and sign contracts for service
agreements with Registered Code Agencies and appoint them to perform specified
functions from time to time in order to maintain the time periods for permits prescribed in
Division C, Section 1.3.1.3 of the Building Code.
The Registered Code Agency may be appointed to perform one or more of the specified
functions described in Section 15 .15 of the Act.
32.
SEVERABILITY
Should any section, Subsection, clause or provision of this by-law be declared by a court
of competent jurisdiction to be invalid, the same shall not affect the validity of this by-
law as a whole or any part thereof, other than the part so declared to be invalid.
Read a FIRST, SECOND and THIRD time and passed this 26th day of August, 2019.
~
PAT=
SIGNED: ---,.-t-:r---------
M AYO R
LINDA MCLEAN
~~
SIGNED:
.
. AA /
CLRK-ADMI ISTRATOR
Certified True Copy of
By-Law No. 3564/19
Clerk
SCHEDULE "A"
TOWN OF IROQUOIS FALLS
BY-LAW NO. 3564/19
FORM 1
FORM2
FORM3
FORM4
FORMS
FORM6
FORM7
FORM8
FORM9
FORM 10
FORM 11
FORM 12
FORM 13
FORM 14
FORM 15
FORM 16
FORM 17
FORM 18
FORM 19
Respecting Forms
Application for Building Permit (to also include Demolition, Partial, Sign, Change
of Use, Conditional, Plumbing)
Permit for Building, Demolition, Partial, Sign, Change of Use, Conditional,
Plumbing
Occupancy Permit
Site Inspection Report
Order to Comply with Act or Building Code
Stop Work Order
Order to Remedy Unsafe Building
Order Prohibiting Use or Occupancy of Unsafe Building
General Review Commitment Certificate
Residential Mechanical Ventilation Design Summary (Part 9 - Design)
Residential Mechanical Ventilation Record (Part 6 - Design)
Ashrae 90.1 - Compliance Summary
Certification Status, Structural Steel - Welding Information
Order to Uncover
Order Not To Cover or Enclose
Order Requiring Tests and Samples
Emergency Order
Energy Efficiency Design Summary (Part 9 Residential)
Residential Occupancy Permit Checklist
SCHEDULE "B"
TOWN OF IROQUOIS FALLS
BY-LAW NO. 3564/19
Respecting
List of Plans or Working Drawings
to Accompany Application for Permits
* Below is a list of plans or working drawings that may be required, but are not limited to the
following:
1.
Site Plan (including lot drainage and grading plans)
2.
Floor Plans
3.
Foundation Plans
4.
Framing Plans (including pre-engineered floor systems)
5.
Roof Plans (including pre-engineered truss systems)
6.
Reflected Ceiling Plans
7.
Section and Details
8.
Building Elevations
9.
Electrical Drawings
10.
Mechanical Drawings (Heating, Ventilation and Air Conditioning Drawings)
11.
Plumbing Drawings
12.
Specifications
13.
Property Survey
14.
Room Schedules
15.
Door and Window Schedules
16.
Fire Alarm Sprinkler and Stand Pipe Plans
SCHEDULE "C"
TOWN OF IROQUOIS FALLS
BY-LAW NO. 3564/19
Respecting Refunds
Status of Permit Application
1.
2.
3.
Application filed.
Administrative function only has been performed.
Application filed.
Administrative and zoning functions
only have been performed.
Application filed.
Administrative, zoning and plans examination
functions have been performed.
4.
Application filed.
Permit has been issued and no field
inspection performed.
5.
6.
7.
Application filed.
Permit has been issued and field inspection(s)
performed.
Permit fee valued at less than $100.00.
Refund of fees for revoked permits.
Percentage of Fee
Eligible for Refund
80%
70%
50%
40%
30%
0%
0%
SCHEDULE "D"
TOWN OF IROQUOIS FALLS
BY-LAW NO. 3564/19
Division C 1.3.5
Notices and Inspections
Division C 1.3.5.1. Prescribed Notices
A minimum of 24 hours advanced notice must be provided by the applicant for the following
inspections:
(a) readiness to construct footings,
(b) substantial completion of footing and foundations prior to commencement of backfilling,
( c) substantial completion of structural framing and ductwork and piping for heating and air-
conditioning systems, if the building is within the scope of Part 9,
(d) substantial completion of structural framing and roughing-in of heating, ventilation, air-
conditioning and air-contaminant extraction equipment, if the building is not a building
to which Clause ( c) applies,
( e) substantial completion of insulation, vapour barriers,
(f) substantial completion of air barrier systems,
(g) substantial completion of all required fire separations and closures and all fire protection
systems including standpipe, sprinkler, fire alarm and emergency light systems,
(h) substantial completion of fire access routes,
(i) readiness for inspection and testing of:
(i)
building sewers and building drains,
(ii)
water service pipes,
(iii)
fire service mains,
(iv)
drainage systems and venting systems,
(v)
the water distribution system, and
(vi)
plumbing fixtures and plumbing appliances,
(j) readiness for inspection of suction and gravity outlets, covers and suction piping serving
outlets of an outdoor pool described in Clause 1.3.1.1.(l)(j) of Division A, a public pool
or a public spa,
(k) substantial completion of the circulation/recirculation system of an outdoor pool
described in Clause 1.3.1.1.(l)(j) of Division A , a public pool or public spa and
substantial completion of the pool before it is first filled with water,
(1) substantial completion of installation of plumbing not located in a structure, before the
commencement of backfilling, and
NOTE: IMPORT ANT
(m) completion of construction and installation of components REQUIRED TO PERMIT the
issue of an occupancy permit under Sentence Div. C 1.3.3.1. (3) or to PERMIT
OCCUPANCY under Sentence Div. C 1.3.3.2. if the building or part of the building to be
occupied is not fully completed.
(n) completion of construction and installation of components required to permit the issue of
an occupancy permit under Sentence 1.3.3.4.
1.3.5.2.Additional Notices: Inspection
(a) commencement of construction of the building,
(b) substantial completion of structural framing for each storey, if the building is a type of
building that is within the scope of Division B, other than Part 9,
( c) commencement of construction of:
(i)
masonry fireplaces and masonry chimneys,
(ii)
factory-built fireplaces and allied chimneys,
(iii)
stoves, ranges, space heaters and add-onfurnaces using solid
fuels and allied chimneys,
( d) substantial completion of interior finishes,
(f) substantial completion of exterior cladding,
(g) substantial completion of site grading,
(h) substantial completion of the pool deck and dressing rooms for a public pool or public
spa and readiness for inspection of the emergency stop system for a public pool or public
spa,
(i) completion and availability of drawings of the building as constructed,and
(j) completion of a building for which an occupancy permit is required under Article 1.3.3.4.
SCHEDULE "E"
TOWN OF IROQUOIS FALLS
BY-LAW NO. 3564/19
CONFLICT OF INTEREST POLICY
The purpose of this policy is to recognize an appropriate balance between employees who are
involved with supplementary employment and the corresponding potential for conflict of interest,
including perceived conflict of interest. In doing so, the intent of this policy is to make a clearer
distinction between perceived and direct conflict of interest. The intent is to proactively avoid
the potential for a direct conflict of interest situation and to minimize the potential for a
perceived conflict of interest by making a.
Outside Design and Outside Inspection Services: For the purposes of this policy, design and
inspection services are those building related services that are provided by Building Department
staff on their own personal time and are not affiliated with Town working hours or services.
Direct Conflict of Interest: For the purposes of this policy, a direct conflict of interest involves
any of the following scenarios:
- Where an employee provides Corporate plans review and/or inspection services involving
a property where the same employee has provided outside design and/or inspection
services and/or related services;
- Where an employee offers and/or provides outside design and/or inspection and/or other
related services during normal Town working hours;
- Where an employee receives payment for outside design and/or inspection and/or other
related services from a contractor, engineering, architectural, or other firm; and
- Where an employee, in providing outside design and/or inspection and/or other related
services, utilizes corporate vehicles, equipment, computers, software, supplies or other
services (telephone, fax, and email).
This policy applies to all union and non-union employees of the Building Department who
provide services under the authority of the Ontario Building Code Act, as amended.
Employees shall not be prohibited from engaging in supplementary employment, including self-
employment, unless it interferes with their ability to carry out their employment with the Town;
involves the use of the Town's premises, equipment, or supplies; or places the employee in a
direct conflict of interest with the Town.
It is the responsibility of employees to immediately declare any and all potential conflict of
interest situations to their Supervisor/Manager prior to taking on any outside work described in
this policy.
Employees are expected to carryout their municipal duties in a consistent and professional
manner. In doing so, staff shall not give preferential treatment, of any sort, in the review of plans
or the completion of inspections that involved outside design, inspection or other related work
that has been completed and/or declared by Department employees on their own time.
The Supervisor/Manager will be responsible for conducting periodic reviews of designs and
inspection reports completed by Division staff to ensure that municipal duties have been carried-
out in a consistent and professional manner and that no preferential treatment, of any sort, is
given to any outside design, inspections, or other related work completed by staff for their client
on their own time.
It is the responsibility of the Supervisor/Manager to proactively avoid any potential conflict of
interest situations by ensuring that a transparent process is established and by ensuring that their
respective employees are familiar with the provisions of this policy. Supervisor/Manager shall
disclose any potential conflict of interest to their respective Department Head.
Should it be determined that an employee has purposely contravened this policy, the
Supervisor/Manager and Department Head will take appropriate correction action to discipline
the offending employee, which may include the termination of that employee.
Building Department employees shall not engage in any business or transaction of a financial or
personal nature that would compromise the fair and honest discharge of their official duties with
the Corporation of the Town oflroquois Falls.
Where it is believed that a potential direct, or perceived, conflict of interest may exist, the
employee shall fully disclose any potential conflict of interest to the Department Head of the
Town. In doing so, the employee shall:
-
Prior to agreeing to provide any outside design and/or inspection services and/or other
related outside services, immediately disclose the potential direct or perceived conflict of
interest to the Department Head.
-
In cases where a potential direct conflict of interested is determined by the Department
Head, the employee, with the assistance of the Department Head, shall remove
himself/herself from the direct conflict of interest situation.
-
In removing himself/herself from the potential direct conflict of interest situation, the
affected employee shall not engage in any Building Department plans review and/or
inspection services that affect the subject property in which outside design and/or
inspection services and/or other related services have been provided.
SCHEDULE "F"
TOWN OF IROQUOIS FALLS
BY-LAW NO. 3564/19
RESPECTING PLUMBING
1. PERMITS AND FEES
1.1
No person shall construct, repair, renew or alter plumbing, and no person shall cause
plumbing to be constructed, repaired, renewed or altered, without first having obtained a
building permit.
1.1.1
Notwithstanding Subsection 1. I, no permit shall be required for the following
work:
a)
maintenance as herein defined,
b)
the doing of plumbing work or drain laying by a commercial,
institutional, educational or industrial establishment in its own premises
or by a municipality or a local board thereof (as defined by the
Municipal Affairs Act, Section 1, Chapter M46 RSO 1990, and all
amendments thereto) which work is respectfully performed by licensed
Journeyman Plumbers and Drain layers who are employees of such
establishment, municipality or local board.
c)
replacing or repairing a valve, faucet or fixture.
1.2.1
No permit shall be issued by the Chief Building Official until the following
have been filed with the Building Department.
a) An application for a building permit in the form provided by the
Corporation completed by the, Plumber, Designer, Building Contractor,
or Owner pursuant to the provisions of the Building By-Law.
b) Two (2) complete sets of plans and specifications prepared electronically
or drawn in ink, to scale, and on suitable paper describing all aspects of
the plumbing.
1.2.2
Notwithstanding sub-section (1) plans and specifications shall not be
required for plumbing in detached houses, semi-detached houses,
townhouses or row houses containing not more than two dwelling units in
each house as per Div. C. 3.2.4.1 of the Ontario Building Code.
1.3
Where required under the Ontario Water Resources Act, an application for a permit for
a private sewer shall be submitted to the Ministry of the Environment for an Approval
Certificate under Section 53 of the Ontario Water Resources Act, R.S.O 1990, Chapter
040 R.S.O. 1990.
2. Inspections and Testing
2.1
Where the property is serviced by a building sewer and building storm sewer, the
Plumbing Contractor or Owner who installed the plumbing shall upon completion of all
plumbing to such sewers conduct a dye test to ensure there is not cross connection
between the sanitary and storm drainage systems and shall submit written
documentation to the Chief Building Official that such test was carried out and that
there is no cross connection between the systems.
Application for a Permit to Construct or Demolish
This form is authorized under subsection 8(1.1) of the Building Code Act, 1992
For use by Principal Authority
Application number:
Permit number (if different):
Date received:
Roll number:
Application submitted to:
The Corporation of the Town of Iroquois Falls
(Name of municipality, upper-tier municipality, board of health or conservation authority)
A. Project information
Building number, street name
Unit number
Lot/con.
Municipality
Postal code
Plan number/other description
Project value est. $
Area of work (m')
B.
Purpose of application
D
New construction
Addition to an
D
Alteration/repair
D
Demolition
Conditional
existing building
Permit
Proposed use of building
Current use of building
Description of proposed work
C. Applicant
Applicant is:
I
[Owner or
I
[Authorized agent of owner
Last name
First name
Corporation or partnership
Street address
Unit number
I Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
D.
Owner (if different from applicant)
Last name
First name
Corporation or partnership
Street address
Unit number
I Lot/con.
Municipality
Postal code
Province
E-mail
Telephone number
Fax
Cell number
Application for a Permit to Construct or Demolish-
Effective January 1, 2014
Page 1 of 4
E. Builder (optional)
Last name
First name
I Corporation or partnership (if applicable)
Street address
Unit number
I Lot/con.
Municipality
Postal code
I Province
E-mail
Telephone number
Fax
Cell number
F. Tarion Warranty Corporation (Ontario New Home Warranty Program)
i.
Is proposed construction for a new home as defined in the Ontario New Home Warranties
rr- rr-
Plan Acn If no, go to section G.
ii.
Is registration required under the Ontario New Home Warranties Plan Acn
I
!Yes
I
I No
iii. If yes to (ii) provide registration number(s):
G. Required Schedules
i) Attach Schedule 1 for each individual who reviews and takes responsibility for design activities.
ii) Attach Schedule 2 where application is to construct on-site, install or repair a sewage system.
H. Completeness and compliance with applicable law
i) This application meets all the requirements of clauses 1.3.1.3 (5) (a) to (d) of Division C of the
LJYes
LJNo
Building Code (the application is made in the correct form and by the owner or authorized agent, all
applicable fields have been completed on the application and required schedules, and all required
schedules are submitted).
Payment has been made of all fees that are required, under the applicable by-law, resolution or
ri- No
regulation made under clause 7(1 )(c) of the Building Code Act, 1992, to be paid when the
application is made.
ii) This application is accompanied by the plans and specifications prescribed by the applicable by-law, Yes No
resolution or regulation made under clause 7(1 )(b) of the Building Code Act, 1992.
iii) This application is accompanied by the information and documents prescribed by the applicable by-
LJYes
LJNo
law, resolution or regulation made under clause 7(1)(b) of the Building Code Act, 1992 which enable
the chief building official to determine whether the proposed building, construction or demolition will
contravene any applicable law.
iv) The proposed building, construction or demolition will not contravene any applicable law.
rr- ri-
I. Declaration of applicant
I
declare that:
(print name)
1.
The information contained in this application, attached schedules, attached plans and specifications, and other attached
documentation is true to the best of my knowledge.
2.
If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.
Date
Signature of applicant
Personal information contained in this form and schedules is collected under the authority of subsection 8(1.1) of the Building Code Act, 1992, and will be
used in the administration and enforcement of the Building Code Act, 1992. Questions about the collection of personal information may be addressed to: a)
the Chief Building Official of the municipality or upper-tier municipality to which this application is being made, or, b) the inspector having the powers and
duties of a chief building official in relation to sewage systems or plumbing for an upper-tier municipality, board of health or conservation authority to whom
this application is made, or, c) Director, Building and Development Branch, Ministry of Municipal Affairs and Housing 777 Bay St., 2nd Floor. Toronto, M5G
2E5 (416) 585-6666.
Application for a Permit to Construct or Demolish- Effective January 1, 2014
Page 2 of 4
Schedule 1: Designer Information
Use one form for each individual who reviews and takes responsibility for desiqn activities with respect to the project.
A.
Project Information
Building number, street name
Unit no.
I Lot/con.
Municipality
Postal code
I Plan number/ other description
B.
Individual who reviews and takes responsibility for design activities
Name
I Firm
Street address
Unit no.
I Lot/con.
Municipality
Postal code
I Province
E-mail
Telephone number
Fax number
Cell number
C. Design activities undertaken by individual identified in Section B. [Building Code T~ble 3.5.2.1. of
Division C]
LJHouse
0HVAC - House
LJBuilding Structural
D Small Buildings
D Building Services
Plumbing - House
D Large Buildings
Detection, Lighting and Power
Plumbing - All Buildings
D Complex Buildings
n
Fire Protection
Don-site Sewage Systems
Description of designer's work
D. Declaration of Designer
I
declare that (choose one as appropriate):
(print name)
I review and take responsibility for the design work on behalf of a firm registered under subsection 3.2.4.of Division
C, of the Building Code. I am qualified, and the firm is registered, in the appropriate classes/categories.
Individual BCIN:
Firm BCIN:
I review and take responsibility for the design and am qualified in the appropriate category as an "other designer''
under subsection 3.2.5.of Division C, of the Building Code.
Individual BCIN:
Basis for exemption from registration:
The design work is exempt from the registration and qualification requirements of the Building Code.
Basis for exemption from registration and qualification:
I certify that:
1.
The information contained in this schedule is true to the best of my knowledge.
2.
I have submitted this application with the knowledge and consent of the firm.
Date
Signature of Designer
NOTE:
1.
For the purposes of this form, "individual" means the "person" referred to in Clause 3.2.4. 7(1) (c).of Division C, Article 3.2.5.1. of
Division C, and all other persons who are exempt from qualification under Subsections 3.2.4. and 3.2.5. of Division C.
2.
Schedule 1 is not required to be completed by a holder of a license, temporary license, or a certificate of practice, issued by the Ontario
Association of Architects. Schedule 1 is also not required to be completed by a holder of a license to practise, a limited license to practise,
or a certificate of authorization, issued by the Association of Professional Engineers of Ontario.
Application for a Permit to Construct or Demolish- Effective January 1, 2014
Page 3 of 4
Schedule 2: Sewage System Installer Information
A.
Project Information
Building number, street name
Unit number
I Lot/con.
Municipality
Postal code
I Plan number/ other description
B.
Sewage system installer
Is the installer of the sewage system engaged in the business of constructing on-site, installing, repairing, servicing, cleaning or
emptying sewage systems, in accordance with Building Code Article 3.3.1.1, Division C?
Oves (Continue to Section C)
D
No (Continue to Section E)
Installer unknown at time of
application (Continue to Section E)
C.
Registered installer information (where answer to Bis "Yes")
Name
BCIN
Street address
Unit number
I Lot/con.
Municipality
Postal code
I Province
E-mail
Telephone number
Fax
Cell number
D.
Qualified supervisor information (where answer to section B is "Yes")
Name of qualified supervisor(s)
Building Code Identification Number (BCIN)
E.
Declaration of Applicant:
I
declare that:
(print name)
I am the applicant for the permit to construct the sewage system. If the installer is unknown at time of application, I shall
submit a new Schedule 2 prior to construction when the installer is known;
OR
I am the holder of the permit to construct the sewage system, and am submitting a new Schedule 2, now that the installer is
known.
I certify that:
1.
The information contained in this schedule is true to the best of my knowledge.
2.
If the owner is a corporation or partnership, I have the authority to bind the corporation or partnership.
Date
Signature of applicant
Application for a Permit to Construct or Demolish - Effective January 1, 2014
Page 4 of 4
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street, PO Box 230
Iroquois Falls, Ontario
POK IGO
C Eligible for CIP Grant
cJ E9 I I Address Plate
A. Documents and approvals required
Plan
Drainage Specs
plan
Prof.
MRCA
Arc/Eng
Health
Unit
MTO
Re-
zoning
CIA
Pre-start E9 I I
1-l&S
Plate
Fire
CWB
Marshall
LLCBO
B. Building
No. of Rooms____
No. of dwelling Units
_
Type of Construction
Wood MMasonry Concrete
Steel
C. Plumbing
Heating
_
No. of stories___ Height
_
Plumbing !
New
C Repair
Alter
: Extension Plumbing System/Sewer
Septic
Water Service:Public
Size ofSewer
No.ofstacks
F.D.'s
R.D's
L.T's
W.C.'s
_
7 Private
Bath
Shower
Basins
Sinks
H.W. Tanks
Urinals
Bldg Sewer
_
Washing Machine
_
Grease /Oil Interceptor
_
Drinking Fountain
_
Address:
Owner/Plumbing Contractor/Master Plumber
D. Zoning
Front Yard
Interior Side Yard
Exterior Side Yard
Rear Yard
Remarks
Lot Size
Lot/Area
Total Lot Coverage
_
Accessory Bldg Set Back
_
Planning Area
_
By-Law No.
CIA No.
_
As per attached site plan
_
Zoning Approval
_
E. Engineering Application Approval
Date -----------------
Services Required To Be Paid By Owner:
Remarks:
Yes
No
Service Fee -------- Water Meter Yes No
Engineer Approval----_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_----=-----
F. Application Approval
Date:
Building Permit Fee
_
Receipt No.
_
Application Approval
_
for CHIEF BUILDING OFFICIAL
Date:
111111111111111111111111
I I I I I I I I I I I I I I I I I I I I I I I I
I
I
I
-
-
TOWN OF
11
I
.
-
: IROQUOIS FALLS:
I
I
. I
I
I
BUILDING PERMIT
I!
I
I
I
I
I
2019
\
I
Dme
I
I
---~~ I
I
I
I Ptrnil Issued in aeoordaace wilh infornation furnishd by Application No.
I
I
I
I ----~---
.
I
11
All cons1ruc11an shall co1furm to: The !iJl1onna1ion, plans and s11cfflca1ions ·submiUed with le 11
I .above nated app . atfon; It lhe pro~sions of the Ontario Build ng Code Act, as amended, and I
11 the regulatimns made thereunder, as a11ended; .
nit al By-.laws and ether ap litable statutes 11
I and laws, as a11ended.
I
I
I
I .
11
Issued Br--------~ 11
I
Cfliet Bllil-in1 Otliial
.I
I
I
111111111111111111111111
I I I I I I I I I I I I I I I I I I I I I I I I I
CONTRACTORS, BUILDERS & OWNERS RESPONSIBILITIES
DURING CONSTRUCTION
Whether you plan to do the work yourself or hire a Contractor or friend, the property owner and the permit holder
must fulfill certain responsibilities for Code compliance during construction, and for notification for inspections.
Please read and follow these steps.
1.
Post the permit card in a conspicuous location at the project site.
2.
Call the Building Department 48 HOURS IN ADVANCE ofneeding an inspection.
3.
Inspections arc required before any work is concealed or buried. Specifically, the Code requires that you
give notice of your readiness for an Inspection. If changes are anticipated, speak with the inspector to
determine ifit can be done, and if revised drawings will be required.
4.
OCCUPANCY of a new building or an addition is PROHIBITED until an inspection has confirmed that ALL
STRUCTURAL, HEALTH AND SAFETY REGULATIONS have been complied with. Separate permits are
required for the installation, extension, or alteration of the electrical system. Please contact Ontario Hydro for
the necessary permits,
5.
The Building Inspector has a responsibility to you and your family to ensure the Code regulations is complied
with. Please co-operate to accommodate the Inspector's Inspection when they come to the project site.
REQUIRED INSPECTIONS
-
Excavation
-
Footings and foundations
-
Framing, insulation, vapour barriers, and HVAC ductwork
-
Plumbing-inspected and tested
-
Masonry fireplaces and chimneys, factory build fireplaces and solid fuel stoves,
ranges, space heaters, and associated chimneys
-
Fire separations and closures, standpipes, sprinklers, fire alarms systems and
emergency lighting systems
-
Interior finishes, HVAC equipment
-
Life Safety components
-
Exterior cladding, fire access routes and site grading
-
Final Inspection
Your building inspector is:
_
No. to contact your inspector:
_
PLEASE CALL YOUR INSPECTOR 48 HOURS IN ADVANCE FOR AN INSPECTIONS
Please identify the address, permit number and project status
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street PO Box 230
Iroquois Falls, Ontario
POK IGO
OCCUPANCY PERMIT
Occupancy Permit No. :
Building Permit No:
Property Address:
Legal Description:
Owner:
Applicant:
To Construct:
An occupancy inspection(s) of the dwelling unit were completed on
(date).
At the time of the inspection(s), the dwelling unit met the minimum requirements for
residential occupancy set out in Division C, Article 1.3.3.2 of
the Building Code.
Any incomplete item(s) that do not prevent occupancy, but require further inspection(s) subject to
additional notices in accordance to the municipal Building By-law, are identified in the box below.
Comments:
Outstanding order to comply
YES_(see attached)
NO
Permission to occupy is hereby granted.
Print Name: -----------
Signature:
Date:
Issued by:
The Chief Building Official, CBO
or a person designated by the CBO
Note: Other approvals and inspections may be necessary from Utility Companies and/or other Agencies or Departments.
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street, PO Box 230
Iroquois Falls, Ontario
POK IGO
Site Inspection Report
File Number: (optional)
Date issued:
Permit Number:
Project location:
Report issued to Contractor :
(name and address)
Telephone No.:
Report issued to Owner :
( name and address)
Telephone No:
Item
Comments
Report issued by:
Name
Signature
_
Date Report issued:
BCIN
Telephone no.
Report Received by:
Name
Signature
_
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street PO Box 230
Iroquois Falls, Ontario
POK IGO
Order to Comply
Order Number: (optional)
_
Address to which Order applies:
Order issued to (name and address):
1.
2.
The inspection on or about
_
Pursuant to Subsection 12(2) of the Building Code Act, 1992
Date Order issued: -------------
Application/Permit Number:
3.
4
(date) at the above-referenced address found the following
contravention(s) of the Building Code or the Building Code Act, 1992.
You are hereby ordered to correct the contraventions itemized below immediately, by the dates listed below, or by
________
(date).
Item
Reference
Description and location
Required action and compliance date
Order issued by:
Name
Signature
Contact name ( optional) ----------------
BCIN
Telephone No.
----------------
Contact tel. number (optional)
Note:
-
It is illegal to obstruct the visibility of a posted Order. It is also illegal to remove a posted Order unless authorized by an
inspector or Registered Code Agency. [Building Code Act.I 992 s. 20]
-
An Order may be appealed to the Superior Court of Justice. [Building Code Act, 1992 s. 25]. It may also be appealed to the
Building Code Commission concerning the sufficiency of compliance with the technical requirements of the Building Code.
[Building Code Act, 1992 s. 24]
o
Failure to comply with this Order could result in a Stop Work Order. [Building Code Act, 1992 s. 14]
-
Failure to comply with this Order is an offence which could result in a fine. [Building Code Act, 1992 s.36]
o
No construction affected by this Order is to be covered until inspected and approved. [Building Code Act, 1992 s.13)
This form is authorized by the Minister of Municipal Affairs and Housing under the Building Code (O.Reg403/97)
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street, PO Box 230
Iroquois Falls, Ontario
POK !GO
Order Number: (optional)-----------
Address to which Order applies:
Order issued to (name and address):
I.
Stop Work Order
Pursuant to Subsection 14(1) of the Building Code Act, 1992
Date Order issued:
_
Application/Permit Number:
3.
2.
4.
The inspection on or about
(date) at the above-referenced address found the fol lowing
contravention(s) of the Building Code Act, 1992 or the Building Code have not been rectified as required by the Order(s)
indicated below:
Order to Comply number----------------~
dated
_
Order Not to Cover number
dated
_
Order to Uncover number
, dated
_
You are hereby ordered to immediately cease construction and/or demolition as specified below:
Item
Details
Order issued by:
Name
Signature
_
Contact name (optional)
_
Note:
BCIN
Telephone no.
Contact tel. number (optional)
_
It is illegal to obstruct the visibility of a posted Order. It is also illegal to remove a posted Order unless authorized by an
inspector or Registered Code Agency. [Building Code Act, 1992 s. 20]
-
An Order may be appealed to the Superior Court of Justice. [Building Code Act, 1992 s. 25]. It may also be appealed to the
Building Code Commission concerning the sufficiency of compliance with the technical requirements of the Building Code.
[Building Code Act, 1992 s. 24]
Failure to comply with an Order is an offence which could result in a fine. [Building Code Act, 1992 s. 36]
When a Stop Work Order is issued, no person shall perform any act in the construction or demolition of the building in
respect of which the Order is made other than work necessary to carry out the Order to Comply, the Order Not to Cover,or
the Order to Uncover. [Building Code Act, 1992 s. 14]
This form is approved by the Minister of Municipal Affairs and Housing under the Building Code Act, 1992
Page I of!
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street PO Box 230
Iroquois Falls, Ontario
POK IGO
Order to Remedy Unsafe Building
Pursuant to Subsection 15.9-(4) of the Building Code Act, 1992
Order Number: (optional)
_
Address to which Order applies:
Order issued to (name and address):
I.
Date Order issued:
_
Application/Permit Number:
3.
2.
4
The inspection on or about_________ (date) at the above-referenced address found an unsafe condition, as
defined in subsection 15.9-(2) of the Building Code Act, by reason of the following:
Item
Reference
Description and location
Required action and compliance date
You are hereby ordered to take remedial steps set out above to render the building safe by the dates listed above or by -------~(date).
Order issued by:
Name
Signature
Contact name ( optional) ---------------
BCIN
Telephone
Contact tel. number ( optional)
Noter-
It is illegal to obstruct the visibility of a posted Order. It is also illegal to remove a posted Order unless authorized by an
inspector or Registered Code Agency. [Building Code Act, 1992 s. 20]
An Order may be appealed to the Superior Court of Justice. [Building Code Act, 1992 s. 25]. It may also be appealed to the
Building Code Commission concerning the sufficiency of compliance with the technical requirements of the Building Code.
[Building Code Act, 1992 s. 24]
-
Failure to comply with this Order could result in the Chief Building Official, by order, prohibiting the use or occupancy of
the building and causing the building to be renovated, repaired or demolished to remove the unsafe condition. [Building
Code Act, 1992 s.15.9-(6) to (9)]
Failure to comply with an Order is an offence, which could result in a fine. [ Building Code Act, 1992 s.36]
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street, PO Box 230
Iroquois Falls, Ontario
POK !GO
Order Prohibiting Use or
Occupancy of Unsafe Building
Pursuant to Subsection 15.9-(6) of the Building Code Act, 1992
Order Number: (optional)
_
Address to which Order applies:
Order issued to (name and address):
1.
Date Order issued:
_
Application/Permit Number:
3.
2.
4.
TAKE NOTICE that whereas the action required in the ORDER TO REMEDY UNSAFE BUILDING issued on the
________
(date) with respect to the above-mentioned building has not been complied with within the time
specified in it, or where no time was specified, within reasonable time, it is hereby ordered that use or occupancy
immediately cease as specified below.
All Occupancy __
Partial Occupancy __ (specify)
I
All Use
Partial Use __ (specify)
--
i
I
Order issued by:
Name
BCIN
Signature
_
Contact name ( optional) ---------------
Note:
-
It is illegal to obstruct the visibility of a posted Order. It is also illegal to remove a posted Order unless authorized by an
inspector or Registered Code Agency. [Building Code Act, 1992 s. 20]
-
An Order may be appealed to the Superior Court of Justice. [Building Code Act, 1992 s. 25]. It may also be appealed to the
Building Code Commission concerning the sufficiency of compliance with the technical requirements of the Building
Code.[Building Code Act, 1992 s. 24]
-
If an order of an inspector under subsection 15 .9(-4) is not complied with within the time specified in it, or where no time is
specified, within a reasonable time, the Chief Building Official may cause the building to be renovated, repaired or
demolished to remove the unsafe condition. For this purpose, the Chief Building Official, an inspector and their agents may
enter upon the land and into buildings at any reasonable time without a warrant. [ Building Code Act, 1992 s.15. 9-(6)(b) and
(7)]
-
Failure to comply with an Order is an offence which could result in a fine. [Building Code Act, 1992 s.36]
Telephone no.
Contact tel. number ( optional)
_
This form is authorized by the Minister of Municipal Affairs and Housing under the Building Code Act, 1992
COMMITMENT TO GENERAL REVIEW BY ARCHITECT AND ENGINEER
PART A - TO BE COMPLETED BY OWNE
Project Description:
Permit Application No.
Address of Project:
Municipality:
WHEREAS the building code requires that the project described above be designed and reviewed during construction or demolition by an
architect, a professional engineer or both that are licensed to practice in Ontario, and
WHEREAS Ontario law prohibits the construction or demolition of a building if a permit has not been issued to authorize it, and
WHEREAS architects and engineers are prohibited by law from undertaking general review of construction if a permit has not been issued,
NOW THEREFORE the Owner, who intends to construct or demolish or have the building constructed or demolished, hereby confirms that:
1. The undersigned architect and/or professional engineers have been retained to provide general review of the construction or demolition of the building
to determine whether the work is in general conformity with the plans and other documents that form the basis for the issuance of a permit, in
accordance with the performance standards of the Ontario Association of Architects (OAA) and/or Professional Engineers Ontario (PEO);
2. All general review reports by the architect and/or professional engineers will be forwarded to the Chief Building Official;
3. Should any retained architect or professional engineer cease to provide general review for any reason during construction or demolition, the Chief
Building Official will be notified in writing immediately, and another architect or engineer will be appointed so that general review continues without
interruption; and
4. Construction or demolition will only be undertaken if an architect and/or professional engineers are retained to undertake general review, and a permit
authorizing the proposed construction or demolition has been issued.
The undersigned hereby certifies that he/she has read and agrees to the above
Owner's Name:
Date:
Owner's Address:
Telephone:
Signature of Owner:
(or authorized agent)
Print Name:
Fax:
Coordinator of the work of all consultants:
Address:
Telephone:
Fax:
PART B - TO BE COMPLETED BY CONSUL TANT
The undersigned architect and/or professional engineers hereby certify that they have been retained to provide general review of the parts of
construction or demolition of the building indicated, to determine whether the work is in general conformity with the plans and other documents that form
the basis for the issuance of a permit, in accordance with the performance standards of the OAA and/or PEO.
ARCHITECTURAL
STRUCTURAL
MECHANICAL
ELECTRICAL
SITE SERVICES
OTHER:
_
Consultant Name:
Signature:
Print Name:
Date:
Telephone:
Address:
ARCHITECTURAL
Consultant Name:
STRUCTURAL
MECHANICAL
Signature:
ELECTRICAL
SITE SERVICES
Print Name:
OTHER:
_
Date:
Telephone:
Address:
ARCHITECTURAL
Consultant Name:
STRUCTURAL
MECHANICAL
Signature:
ELECTRICAL
SITE SERVICES
Print Name:
OTHER:
_
Date:
Telephone:
Address:
ARCHITECTURAL
Consultant Name:
STRUCTURAL
MECHANICAL
Signature:
ELECTRICAL
SITE SERVICES
Print Name:
OTHER:
_
Date:
Telephone:
Address:
EABO standard form. Endorsed by OAA, PEO and Ontario Building Officials Association
08/2008
~?~:-1;;.'1';~;··;
.. ,::·1I::LQC~f{QN:Qf.JN..$J~1,:!?AiiPNil~;;:,.;;;:·;g{,~ti~t
Lot#
Plan#
:;;l1~;:,1io;r,J1<L>;;VEf!T;lb!\'r10NsCAP.Aoi:i;y:,~}}2"a:-J:of.-J."1fiF,.~
Bsmt & Master Bedroom
@ 10Us
Us
Township
Other Bedrooms
__
._@5Us
Us
Roll#
Permit#
Bathrooms & Kitchen
__
@5Us
Us
Address
Other Rooms
__
@5Us
Us
ixt~ftti'.f1'f':':l!'.lci!i~J;flij!)_~ijjl~t,.\;~£;:1i-;iJtti;~j
Name
Address
City
Tel.
Fax
;~~~~1~f!.N$Jt:jJt'f1~:G'~:~ffillM'G:.~Jf1~1f/:77iXl~~~~
Name
Address
TOTAL
Us
r-~Jfil1ijfil!Hi!,P:~!;i'!.sMI!~!!9.~JRl~~Ql:U'~2f~£-~1~,i(~)''~Afil
Master Bedroom
@ 15Us
Us
Other Bedrooms
__
@7.5Us
Us
TOTAL
Us
:li\r(f#~~~ftr!,itt~!R~~fEi(f:lJ~~:t.ifilsff{$~Rf!3'1fft(~i,1~t~l~
Model;
Location:
Us
Sones
0HVI
City
Tel.
Fax
~1~11l~Q9M.~lt§;Ji!W1~flR!¥!!.s.KQ~s§}!!I~i~~J';tf(~l~~it~I
a) 0 Direct Vent (sealed cornbusnon) only
b) D Positive venting induced draft (except fireplaces)
c) D Natural draft, B-vent or induced draft fireplace
d)0 Solid Fuel (including fireplaces)
e)O No Combustion Appliances
fu.~i4.;~fti_~~ggg~g_~~Y;~N[itl~tq~:M¥fli~Y\tt'j11'~~
Model:
D Electric Space Heat (if more than 10% of heating load)
lfflf':$:~I;!il~'m~.(1)Q§q}~~{1~2;;t~1!<2>l.!:.~li1:1Wi5i~:fi~
I Type a) orb) appliances only, no solid fuel
II Type I except with solid fuel (including fireplace)
om Any Type c) appliance = Part 6 Design
Orv Electric Space Heat (if more than 10% of heating load)
D Other: No forced air = Option 4
___
Us High
Us Low
___ % Sensible Efficiency@ .-25°C
O HVI
Total Ventilation Capacity
Us
Less Principal Ventilation Capacity
Us
Required Supplemental Ventilation Capacity
Us
Location
Model
Us
SONES
HVI
r1f~~i1;J~lft,:f§.oc~JT~M;P.t:;§i§~'©:ij)iIQ'.f{;:;;~~t?rm1;m
D I
· Exhaust Only/ Forced Air System
D 2 HRV with Exhaust Ducts/ Forced Air System
0 3 HRV Simplified Connection to Forced Air System
0 4 HRV - Full Ducting/ Not Coupled to Forced Air System
D Part 6 Design
:m;JJf&?tiWl~PJ;§!GNl:iB.f¢E~l!!f,IQA!J~f{®'§J,1!t:i~~f.fi~m
I hereby certify that this ventilation system has been designed in
accordance with the Ontario Building Code.
Name
Signature
HRAI#
Date
0 01'1-elrog has E~lric Service?
D Oviellil~ inleooed fO!' con1inuous winter occupancy?
I
l
ns
NO
0 Part 9 Dwelling Unil?
0 Setf-Conlainecl Venlilatbn system s.etVing only ooe d'llelling unit?
D Less than 5 bedrooms?
D Part 9' Sysiem Oesiro:l?
YES TOAll
O All non-solid fuel aPf){can,ces dire::t vent or
mechanically vented induced draft
D All noo-soltd fuel freplaces are direct ...001
NOTO
EITHDI
NO
TO
ANY
YES
TYPE I
Only direct vented or
rnec/\anicalfy induced a,sft
fuel-fired cambus~
appliaric~; no solid fuel.fired
combustion appliances; onty
diroct -1ented fuel-fired
fireplaoes; no electric space
heat.
TYPEII
All houses viNch ccc,tain
S()f.xj fuel-fir~:1 combus1ion
applianoo.s.
D forced al.r system used t,;i
disiribu(a ventHalion air
NO
rl D Solid Fuel applian~'?
YES
h
NO
NO
Ca<.rpla Venhlatlon Syst1:m
10 FO<red air system?
D EtecmcSpace Heal?
NO
Couple Ventilatkm Sys1am
to Forced air system?
f
YU
HPE [II
AJ noeses containing n.alllral
draft 110n-solid fuel-fired
comt,,.ISlion appliances. or
mechanlcally vented illduced
draft non-solid fuel fl ed
fre-places.
TYPE IV
All noeses !hat con!aln
electric spaee healing_
Optio11 t
Exhaust only ventilalx:tl.
Oplion 2
HRV coupled lo a forced air
heating system. Extended
e'.1:haust ductwork.
Opfion3
HRV coupled to a forc,o...d air
healing system. Simplified
exhaust duclwoo:.
Option 4
HRY not coupled to a Fc«ed
air heating sy$1am, direct
dls1rioo11on.
CO Delector Required If S04kJ Fuel Appliance Present
Residential Mechanical Ventilation Record
for svstems desianed in conformance with CANCSA F326 M91
. - >MINIMUM VENTll:A TION"clAP,ACl'''-""1MVO,~l:f'" "'
Bsmt & Master Bdnn
@ 10L/&
1./S
Other Bedrooms
@ 5 L/S _1./s
Bathrooms & Kitch
__
@ 51./s __
LJs
Other Rooms
__
@SL/s __
L/s
TOTAL ---
=" " , CON'TINU'OusrE)(HAUSTtCAP -
.A'c:l>T,¥~r~
~
Kitchens
__
@30L/6
--
. _L/s
Bathrooms
@10 l/S
L.Js
TOTAL
1./s
~ -
"IINTl!AMITTCNT EXHAUST CAPACITY " -:!'
Kitchens
___ @5OLJs
__
L.Js
Bathrooms
@25 L/s
l.Js
TOTAL
I.ls
~- SYSTEM"INSTALL.E0.TO PROVI0E-MVC"
,
ManufllC!Urer
Modol
OHVI
Design Airflow __
WsHrgh
_ 1./s Low
___ %Sensible Efficiency@ O C ___ watts
__
% Sensible Eff 1c1ency @ -2S'C _watts
'
ADDITIONAi. VENTILATION EQUIPMENT
LOCATION
MODEL
L/S
SONES
HVI
-- -
--
-- -- --
-- -- --
-- -- --
.,
HEA. TING SYSTEM
~
.
01"orced AIr Q Non f'ocQIXI AJr
0
erecrnc
0Gas
0011
0111er
COMBUSTION APPLIANCES
0
No comousoen applulllc:us
No depmssunzallOn tunu
0
Solid Fuel ~ndudlng Fireplaces)
5pa. /1mll
0 O,re<;t Vent (Sealod Combu3~00) anly
Nodr,p hmll
0
Pos1we vcmDng induced dra/1
___ pa dop
0
Natural draft or B vent
5pa.
- OTHER EXHAUST EQUIPMENT
D Clothes Dryer
75 l/C
0 Down.draft Cook lop
110
Olher
_LJ,.
;i,;
'.Jl'f""- ... .&1'0CA'TION,OF INS'T'.11.l!L:A TION
Lot&Planll
Addte&&
, --~
i:. ~
Ji:!" -BUILDER
"'
R20001011
Nwn8
Addrass
City
Code
Toi
Fax
·~-:":ai.t ...
~ - .,;:JNSTALt:lNG"CONTRAC:TOR
~
Name
Address
City
Coda
Tel
Fax
·jRRAII
, MEASUREO VE:NTII.ATION (MVC Sv&tem)
Supply
·--
. LJs High
__
Vs Low
Exhaust _Vs High
__
L/SLOW
INSTALLATION CHECKLIST
0
c.(lrttrola funcbonlng
Fan:. oparanng & clean
0
flll0lll cfoan
Flow Measuring SLo.~ons
0 dampers ecx:eutble
Insulated duct s·aaled
0
Oram loop and cennecten
0 01stnbu~on to·all rooms (ncn forced air)
0
Forced air system conenuocs mode (coupled to forced air)
0 gn,a.:sa llltar kitchen intake
0
Kitchen exhaust 4 fl from range
0
eich&Uil 4- above grade 0
supply ,a- above 11rade
0
supply Inralce 611 from exhaust
Osupply inlill<e :m to other exhaust,
01/ler
'
OESIGNEfl CERTIFICATION
I.hereby certify that lhts venfilatIon sysiem has b.een daslgriod &
lnilalled ecc:crdIng to tha requirements of CAN CSA F326 M91 ·
Name
Signature
jHAAI#
Part 6 Venhlahon System Requirements Selected
Qualified Oasrgner
HO
Return to Sa<;:tlon 9 32
YES
Compltance Standard Is F326
NO
VentJlalton System Design
NO
System Meets 9 32 additional
Aequlremen ts?
H RV Etfletency?
Fan ratings?
Fan Sound ra~Ings?
YES
Ives-
es n
-
NO
(/llcludtn(I sohd fuel)
Manuf or Agency
Apphanc9
-NO
Depressunzation Lrnrt
l
above 5 pa
I
I
YES
Only Direct Vent Appliance?
l
I
I
NO
YES
Pressure_test ol
calbulation
L.
Pressure test or calculation
Manuf, or Agel')c ·L1m,\b' above
10 pa max
5 pa Depressurlzatlorv
Depressur1z:abon @ MVC
@ Rer Exhaust Condition
Pressure test or calculation
5 pa max Depressunz:at,on
@ Ref ~tc~aust.Ccnd1tJon
Ventdabon System
Performance Certlfrcate
(Vo1111tar1on Rword}
Combust10n Applrance(s)
Pr e t
REFERENCED
NUMBER
Project
Project
Name:
Address:
Designer
Designer
IOate:
Name:
Sia nature:
The building design complies with the Basic Requirt:1ments of the following sections:
Section
Reference
ccrncuance
Column
Additional
Forms
5.4
ELECTRIC POWER
OYes
6.4
LIGHTING
OYes
7.4
AUXILIARY SYSTEMS & EQUIPMENT
OYes
8.4
BUILDING ENVELOPE
OYes
9.4
HVAC SYSTEMS
OYes
10.4
HVAC EQUIPMENT
OYes
11.4
SERVICE WATER HEATING SYSTEMS ANO EQUIPMENT
QYes
12.4
ENERGY MANAGEMENT
OYes
Method of Additional Compliance:
O System Component Method
O Building Energy Cost Budget Method
The building design complies with the requirements of:
Section 6 LIGHTING
Section 8 ENVELOPE
Section 9 HVAC SYSTEMS
Section 11 SERVICE WATER HEATING
Prescriptive Criteria (6.5)
System Performance Criteria (6.6)
Prescriptive Criteria (8.5)
System Performance Criteria (8.6)
Prescriptive Criteria (9.5)
Prescriptive Criteria (11.5)
OYes
OYes
OYes
QYes
:t3uiidiri ·
The building design complies with the requirements of Section 13 of the Standard
because the Design Energy Cost Is equal to, or less than, the Energy Cost Budget
as calculated In accordance with the requirements of ASHRAE/IES 90.1
OYes
Notes:
Building design must comply with all Basic Requirements.
Building design must comply with either the System/Component Method or the Building Energy Cost Budget Method. Indicate which
method was selected.
Within the Sys1em/Component Method, indicate whether the Prescriptive Criteria or the System Performance Criteria was used for
Lighting and Envelope compliance.
!PROJECTJNFORMATION.
REFERENCEr--7
NUMBERL__J
Project
Project
Name:
Address:
Designer
Designer
IDate:
Name:
Signature:
PROFESSIONAL STAMP:
PROFESSIONAL STAMP:
CERTIFIED BY:
CERTIFIED BY:
Signature
Date(YY/MM/_DD)
Signature
Oate(YY/MM/DD)
Name and litle
Name and litle
Address
Address
City
Province
City
Province
PROFESSIONAL STAMP:
PROFESSIONAL STAMP:
CERTIFIED BY:
CERTIFIED BY:
Signature
Date{YY/MM/DD)
Signature
Oate{YY/MM/DD)
Name and litle
Name and TIii e
Addresa
Address
City
Province
City
Province
CERTIFICATION STATUS
FORM: STRUCTURAL STEEL- WELDING INFORMATION
CODE REQUIREMENTS:
The Ontario Building Code and CAN3-S 16. 1-M (Steel Structures for Buildings - Liinit States Design) require Steel
Fabricators and Erectors to be certified by the Canadian Welding Bureau to CSA W47.l in Division I or 2.
(Welders must have valid CWB tickets but only companies can be certified) Part of the work may be sublet to a
Division J Fabricator or Erector, however, full-responsibility remains with the Division 1 or 2 company.
This form is to be completed by the applicant for the building permit, and submitted as part of the
building permit application.
PROJECT:
LOCATION:
GENERAL
CONTRACTOR:
NAME
ADDRESS
STEEL
FABRICATOR:
NAME
ADDRESS
TELEPHONE
CONT ACT PERSON
CERTIFIED:
DIV. I
DIV.2 --
DIV.3 --- NOT CERTIFIED
STEEL
ERECTOR:
NAME
ADDRESS
TELEPHONE
CONT ACT PERSON
CERTIFIED:
DIV. I
DIV.2 --
DIV.3 --- NOT CERTIFIED
STEEL DECK
INSTALLATION:
NAME
ADDRESS
TELEPHONE
CONT ACT PERSON
CERTIFIED:
DIV. I
DIV.2 --
DIV.3 __
NOT CERTIFIED
NAME OF WELDING SUPERVISOR
_
WELDER'S NAME
EXPIRY DATE OF TICKET
I.
2.
3.
4.
5.
(SIGNATURE)
(DATE)
PLANS EXAMINER REVIEW AND ASSIGN BUILDING PERMIT NUMBER:
PER:
_
DATE:
_
PERMIT NO.:
_
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street, PO Box 230
Iroquois Falls, Ontario
POK !GO
Order to Uncover
Order Number: (optional)
_
Address to which Order applies:
Order issued to (name and address):
I.
2.
Pursuant to Subsection 13(6) of the Building Code Act, 1992
Date Order issued:
_
Application/Permit Number:
3.
4.
The inspection on or about
(date) at the above-referenced address found the following
contravention(s) of the Building Code Act, 1992 or the Building Code.
__ The part was covered or enclosed contrary to an Order Not to Cover number___ dated
_
The notice required to be given to the Chief Building Official, registered code agency or inspector, before the
part was covered or enclosed under a by-law, resolution or regulation made under clause 7(l)(e) of the Building
Code Act, 1992, was not given or a notice required under section 10.2 was not received;
__ In cases where a notice required under section 10.2 is received, the period prescribed under subsection I 0.2 (2)
did not elapse before the part was covered or enclosed;
_
In cases where a notice required by a by-law, resolution or regulation made under clause 7(1 )(e) is given,
(i)
the inspection period prescribed under clause 7 ( 1 )( e) did not elapse before the part was covered or
enclosed, or
(ii)
if an inspection period is not prescribed under clause 7(1 )( e) a reasonable period of time after the notice
was given did not elapse before the part was covered or enclosed; or
_
The part has been constructed without a permit being issued.
You are hereby ordered to uncover or have uncovered, at your own expense, and make available for inspection the parts
of the building described below immediately, or by
(date).
Description of area to uncover:
Order issued by:
Name
Signature
_
Contact name (optional)
_
Note:
BCIN
Telephone
Contact tel. number ( optional)
_
It is illegal to obstruct the visibility of a posted Order. It is also illegal to remove a posted Order unless authorized by an
inspector or Registered Code Agency. [Building Code Act, 1992 s. 20]
An Order may be appealed to the Superior Court of Justice. [Building Code Act, 1992 s. 25]. It may also be appealed to the
Building Code Commission concerning the sufficiency of compliance with the technical requirements of the Building Code.
[Building Code Act, 1992 s. 24]
Failure to comply with this Order could result in a Stop Work Order. [Building Code Act, 1992 s. 14]
Failure to comply with an Order is an offence which could result in a fine. [Building Code Act, 1992 s. 36]
This form is approved by the Minister of Municipal Affairs and Housing under the Building Code Act, 1992
Page I of I
~~
,,.~\"\£COR~
/:~"1 .· .... ,:T···t
1>"'\~,'\ The_Co~~~ration of the Town oflroquois Falls
! j
""""'\ Ii,"!
-,
;
, Building Division
j z
@/ \;
'") 253 Main Street, PO Box 230
, ~
J Iroquois Falls, Ontario
'{o9u
i POK I GO
~
Order Not to Cover or Enclose
Pursuant to Subsection 13(1) of the Building Code Act, I 992
Order Number: (optional)
_
Address to which Order applies:
Order issued to (name and address):
l.
Date Order issued:
_
Application/Permit Number:
3.
2.
4.
The above-referenced building was inspected on or about
(date).
You are hereby prohibited from covering or enclosing the parts of the building described below, pending an inspection.
Please arrange for an inspection when the part of the building identified below is ready for inspection.
Item
Description of area not to cover or enclose
Order issued by:
Name
BCIN
Signature
_
Contact name (optional)
_
Note:
-
It is illegal to obstruct the visibility of a posted Order. It is also illegal to remove a posted Order unless authorized by an
inspector or Registered Code Agency. [Building Code Act, 1992 s. 20]
-
An Order may be appealed to the Superior Court of Justice. [Building Code Act, 1992 s. 25]. It may also be appealed to the
Building Code Commission concerning the sufficiency of compliance with the technical requirements of the Building Code.
[Building Code Act, 1992 s. 24]
-
Failure to comply with this Order could result in an Order to Uncover and/or a Stop Work Order. [Building Code Act, 1992
s. 14]
-
Failure to comply with an Order is an offence which could result in a fine. [Building Code Act, 1992 s.36]
Telephone no.
Contact tel. number ( optional)
_
This form is authorized by the Minister of Municipal Affairs and Housing under the Building Code Act, 1992
Order Requiring Tests and Samples
Pursuant to Clause 18(1)(!) of the Building Code Act, 1992
Order Number: (optional)
_
Address to which Order applies:
Order issued to (name and address):
I.
Date Order issued:
_
Application/Permit Number:
3.
2.
4.
Description of required tests and samples
The inspection on or about
_
following tests and samples.
(date) at the above-referenced address found the need for the
You are hereby ordered at your expense to take and supply to the undersigned the tests and samples described below by
__________
(date).
Item
Reference
Test and sample required
Order issued by:
Name
BCIN
Signature
_
Contact name (optional)
_
Note:
-
It is illegal to obstruct the visibility of a posted Order. [t is also illegal to remove a posted Order unless authorized by an
inspector or Registered Code Agency. [Building Code Act, 1992 s. 20]
An Order may be appealed to the Superior Court of Justice. [Building Code Act, 1992 s. 25]. It may also be appealed to the
Building Code Commission concerning the sufficiency of compliance with the technical requirements of the Building Code.
[Building Code Act, 1992 s. 24]
Failure to comply with an Order is an offence which could result in a fine. [Building Code Act, 1992 s. 36]
Telephone no
_
Contact tel. number ( optional)
_
This form is approved by the Minister of Municipal Affairs under the Building Code Act, 1992
Page I of I
The Corporation of the Town of Iroquois Falls
Building Division
253 Main Street, PO Box 230
Iroquois Falls, Ontario
POK !GO
Emergency Order
Pursuant to Subsection 15.1 O of the Building Code Act, I 992
Order Number: (optional)
_
Address to which Order applies:
Order issued to (name and address):
I.
2.
Date Order issued:
_
Application/Permit Number:
3.
4.
The inspection on or about
(date) at the above-referenced address found that the building poses an
immediate danger to the health and safety of any person. The particulars of the dangerous conditions include:
In order to terminate the danger, the following remedial repairs, or other work, is required:
Order issued by:
Name
Signature ---------------------
Contact name ( optional) ---------------
Note:
BCIN
Telephone No.
-
It is illegal to obstruct the visibility of a posted Order. It is also illegal to remove a posted Order unless authorized by an
inspector or Registered Code Agency. [Building Code Act, 1992 s. 20]
An Order may be appealed to the Superior Court of Justice. [Building Code Act, 1992 s. 25]. It may also be appealed to the
Building Code Commission concerning the sufficiency of compliance with the technical requirements of the Building Code.
[Building Code Act, 1992 s. 24]
-
The Chief Building Official may, before or after the order is served, take measures necessary to terminate the danger, and
the Chief Building Official, or an inspector, may, at any time, enter upon the land and into the building in respect of which
the order was made without a warrant. [Building Code Act, 1992 s. 15]
The Crown, municipality, or a person acting on behalf of either of them is not liable to compensate the owner, occupant, or
any other person by reason of anything done by or on behalf of the Chief Building Official or an inspector in the
reasonable exercise of his or her powers. [ Building Code Act, 1992 s. 15]
Failure to comply with an Order is an offence which could result in a fine. [Building Code Act, 1992 s. 36]
Energy Efficiency Design Summary
(Part 9 Residential)
A. Project Information
I :-·-w~--··
cipamy
I Postal code
I LoUCon
B. Compliance Option
SB-12 Prescriptive Is0-12 - 2:1.1.1
Table:
Package: A .B C D E F G H I· J K L M (circle one)
SB-12 Performance* rss-12 -2.1.2.1
- Attach energy performance calculations using an approved software
Energy Star®* rss-12 -2.1.3.J
- Attach BOP form
EnerGuide 80® *
- House must be evaluated by NRCan advisor and meet a rating of 80
C. Project Design Conditions
Gross Window+ Area =
ICF Above Grade
oSlab-on round
D. Building Specifications [provide values and ratings of the energy efficiency components propo sed, or attach Energy Star BOP form)
~i..il.'<."'fo"Jil_~uoa1n'olJJ !mp'Q.001(~:-\'ifa1.~,.l.!1~ti..1~·sJJtl~sv.11'J.®'.ii::It,.J ir~"iril:'~a.J:{ll<JJ.hg1(ii~p_Q'i:!jift!{tJ,TrJ"jl-~/fSiil~l;ffl~l~..MYJ8jtJn1i~Lfli
Thennal Insulation
Windows & Doors
Ceiling with Attic Space
Windows/Sliding Glass Doors
Ceiling without Attic Space
Skylights
Exposed Floor
Mechanicals
Walls Above Grade
Space Healing Equip.2
Basement Walls
HRV Efficiency (%)
Slab (all >600mm below grade)
DHW Heater (EF)
Slab (edge only S600mm below grade)
NOTES
Slab (all S600mm below grade, or heated)
1. Provide U-Value In W/m2.K, or ER rating
2. Provide·AFUE or indicate jf condensing type combined system used
E. Performance Design Verification [complete applicable sections if sa-12 Performance, Energy Star or EnerGuideBO options usedJ
SB-12 Performance:
The annual energy consumption using Subsection 2.1.1. SB-12 Package
is
Gj (1 Gi =1000Mj)
The annual energy consumption of this house as designed is
Gj
The software used to simulate the annual energy use of the building is:
The. building is being designed using an air leakage of
air changes per hour @50Pa.
Energy Star: BOP form attached. The house will be labeled on completion by:
Energy Star and EnerGuide80:
Evaluator/Advisor/Rater Nan:,e:
Evalua·ror/Advisor/Rater Licence #:
F. Designers [names of designers who are responsible for the building code design and whose plans accompany the permft appUcatlonJ
I Architectural
I Mechanical
form a1.1thortud by OH8A, OSOA., lMCBO. Fcbrutry 6, 2012
I
Guide to the Energy Efficiency Design Summary Fonn
The EnfJfgy Eflir:/ern;y Oes,'gfl S<11mma.,y t0<m summ8'i:res lhe compliance patt, used by a house diMigllffl" to
comply wltl1 entlf'9V efficleflcy requirements olll~ Cxl!arfo Build!~ Code. This form mus.I aocompany Ille
WI ding permit application. The informaUon on ttws foon W.UST renecl the drawrigs and spe<:lflcaoons being
submil1ed, CJf the bul:ling jlfflnN msy be refused. Raw lo Suw/19msnta,y Stalldard SB-12 for de~ils aPC<Jt
bu'ldlng code compiance requiremeflts. Further noona1ioo about efle(gy er:tlclency rl!lqlifements fot ~w
wtdings is a-1ailable from lhe p<O'llldal building code 1\-ebsite a1 miw.mall,oov.on.ca, or th11 rnmlcipal building
department.
lleginniog Januaiy 1, 2012, a house des¾lner m\lSt IJSe on& of foi. 8f\41rgy efficiency col11C)liarice option$ in ltla
l;,,Jildlng code:
.
1. Comply wilh !he 58;12 Pcw~npfiye oes-,in ~ables,
2. Use the SI.HZ &CT2!flll?Mf1 ~ar,ce meihod. and model tile design against lhe prescrip!~ve standards,
3. Design to Energy Star standards, or
4. e~-awate the design according to EnerGuide technical procedures and aehiiwe a ra1ing of W QI nwre.
COMPLETING THE FORM
B. Compllanca Opllons
Indicate the c001J:li3nce OQtion b~g IIS@d.
- SB-12 Pmscrfptiye requires tllat lhe buili!ltlg conforms to a package ol tttermal ifls!kliOI\, windcv1 and
mecharical systam elr.::kw:y requlramenls set out irl Subsectloo 2. 1.1. of SB-12. Energy efficlericy de-sign
modeling and t~.sllng of the t:Alilding is not re,qlllred under lhls oJJ(ion,
- SB-12 PtUfonvancB refers to1he alterna11v·e melflod of compliiV1¢8 sef out In Sui,s~
2,1.2. or S8·12.
Vsing I.Ns approach Ille designer ~st u~ reoowiized energy simulatioo $Ol\wafe (~oil as HOT2()Q0
V9.~c1.2 or newer), and submit .doolJm4Nli~ which show lhat lhe annual eneigy us~ of the bui'.dlng is eqtJal
lo a pre~li'~e p!!C~e.
- Eneroy Sl{I! l'ooses m1Js1 be desig,Oed to l:J1&rgy $far requl!emool.s aoo be laoolled on completion by
Enerqu-alify or ottier agency. Tho EOOfgy Siar SOP l«m mu&1 be submllled ·11llh the permil documliin1s.
- E11arG11;xtq8Q houses are varida,ed by ~mean authorized energy advi$01'$ arid ll\lJst ~
a ra'1g of 80 or
moie .,,1,en evaltrated In ao::orolln~
-Ntth EnerGuide a<1nwiis.tra1lve. an<! tachnlcal prooedures.
C. Project Ot$lgn Condlllons
Climatic looe: The O(Jmber of degree dayi; for Ontario cities is contained ii SuiiplerM11ta,y Stsndard SB-1
Wi~s. Skyl(gtils 1tnd Glass Doors: If the raoo oftne total gross area-of l\fndciv-r.1, sidelights, sk)fghts aoo
glass dooftl lo the to1al gross area of watlS is more lhatl 17%, h91er efficiency glazing is reg1>1,<e<J. If the ratio is
more than 22:% the S8·12 ernsr;rimi)& Oll<1ion may noc be lJsed, The Iota! a,ea is too sum of ea the s,.'rlrotural
rough opeongs. Soma ex:cef)11ons apply·. Refer to 2.1.1.1. c4 S8-12 10+' furl.her detalts.
Fual Soorce elltJ HM/in{/ Equipmem Efr.icierey: Tile fuel soufce and etlroiel\Cy or tile pr(lgQSied t.eating
equl~el\1 must be sp&::llied in order to determine -Nllich S!H 2 Pr9$CDb(ool compliance pa.ck age table ap;iies.
Otlicf B411/d1ng Cand.'li-Ons: Thes.e conslnJclioo condttlons a/feel S'!MZ Erestr/rlrt,-e comi,iance raquirE!'l1ett-s.
O, Building Speelncallons
Thefmel r,w1ari0n: lndicale the RSI or R--1aJ1Je b81ng proposed where I.hey apjiy to I.tie IWXJse destgn. U11der
111.e SB·12Prosqipli):I! option, RSI 3.52 wall in~~lkl'I is ~rmitted In certain o:mdilionswhere other design
elemenls l'IU!et higher l!'.1aooards. Refm to S8-12 for furtoor dewils.
E. Performance Dulgn Summary
This s.ac!ion Is 001 r&qlllrnd to bs compler.oo if the $8~12 ernscrip!ive Ci)1lon Is ~Ing used.
AIRTIGHTNESS REQUIREMENTS FOR NEW HOUSES
All houses must o:Jmply with iACreased air b~r re,.iulremenls in lflo ooifding code. Notice of air barrim
CQfllp/,etloo must be pro'llded. and ao inspection cooducted PfKlf
1o it being covered. A blo"A<er door last to ,,erify
ijie air 1igh1ness tr! tht!t llmlse must be cot'llli.Jctoo durw,i coBStruciioo if the NRCmr EnerGui®:ll{J_ opticfl is used,
or It the ~.1, ~m~~ or ~rgy Slj?ropliol'iS are us«l ii11d an 1.1ft tlghmess of less tflan 2.5A.CH@ 50 Pa
in I.Ilia case o( detaci:loo houses, or 3.0 ACH @ 50 Pa In !he case ot attached hOi.1$8$ is necessary lo meet I.he
reqtired energy efficiency staml'an:1.
ENERGY EFFICiEt,C'f LAB-E.UNG FOR NEW HOUSES
Ene,goy Sfar and EnerGuide issue labels for new homes corislrocied uodtl.f lhoir onergy efficiency pro-grams.
The builijii\g cod~ does not regulate n&/11 home labelliog_
The Corporation of the Town of Iroquois Falls
OCCUPANCY PERMIT CHECKLIST
OBC, Article 1.3.3.4, Division C
Address:
Roll Number:
Inspector:
General Requlrements
y N
Comments
Structure of the building or part, is substantially complete
- structural members for dwelling unit: footings, foundations, framing (including
exterior decks oorches balconies!
Building envelope with respect to dwelling unit Is substantially complete
- Roofing (including flashing)
- Doors and windows
Insulation, vapour barriers and air barriers complete
- Insulation (locations, RSI Value)
- Air barriers (locations, continuity)
o Vapour barriers (locations materials!
Walls enclosing dwelling unit to be protected
- Batt insulation and vapour barrier to be protected"from mechanical damage)
o Foam tvoe insulation /naid, sprav) to be covered
Grading substantially complete
- Site graded so water will not accumulate near the building
- No adverse affect to adiacent orcoernes
Required electrical supply provided for the dwelling unit
- Where services available, electrical facilities shall be orovided
Required Interconnected Smoke Alann/ Carbon Monoxide Detector
o Smoke alarm/co detector within 16'-5" of bedroom doors
- Smoke alarm reauired on non-bedroom floors
Exits compl~te and operational for dwelling unit
- One exit required (sliding door permitted; Exit through garage acceptable if man
door to the exterior orovidedl
Floor access and egress systems complete and operational for dwelling unit
- Clear path required from any point in the dwelling unit to an exit
- Stairs (width, run, rise, tread depth headroom!
Handralls and Guards complete and operational for dwelling unit
- Substitute guards must comply with OBC requirements
o Exterior doors without deck.only allowed to be open maximum 4" (required to be
oermanentlv secured
Exhaust fume barrier & safety complete and operational between attached
garage and dwelling unit (self closina device weatherstriPoina, deadbolt lo.ck\
Water supply and sewage disposal complete and operational
- Connection to a municipal drinking-water system or to a drinking-water system
- Connection to a public sanitary sewer, combined sewer or a private-sewage
disposal svstem
Lighting system complete and operational
- Exterior lights at entrances with switches in dwelling unit
o Lighting outlets with fixture controlled by a wall switch required for kitchens,
bedrooms, living rooms, utility & storage rooms, laundry rooms, dining rooms,
bathrooms, water closet rooms, vestibules, hallwavs, stairwavs and aaraaes
Heating system complete and operational (ensure fuel supply)
Water system, building drain & building sewer and drainage & venting
system complete, operational and tested
- Hot and cold water functional
- Dve testinQ to confirm proper sewer connections
Required plumbing fixtures substantially complete and operational
- Kitchen sink, lavatory, bath tub or shower & water closet shall be provided
- laundry facilities or a space for laundry facilities provided
- Floor drain to be installed in basement (includinQ Preserved Wood Foundations\
Received By:
_
Date Issued:
_
Residential Occupancy Permit Checklist: Definitions and OBC references & Notes
Definitions
Dwelling Unit means a suite operated as a housekeeping unit, used or intended to be used as a domicile by one or more persons and usually
containing cooking, eating, living, sleeping and sanitary facilities
Substantially Complete means when construction is sufficiently complete in general conformance with the approved plans so that the building can be
occupied for the use for which it is intended.
OBC references and Notes
Structure of the building or part: 9.15.; 9.17.; 9.20.; 9.23.; 9.24.;
Building envelope: 9.27.9.; 9.28.; 9.20. or Part 5; 9.10.14.; 9.26.; 9.6.; 9.7.; 9.9.6.7.; 9.10.13.; Part 12
Insulation, vapour barriers and air barriers: 9.25.2.; 9.25.3.; 9.25.4.; 9.10.17.10.; 9.25.2.3(7).; 9.25.2.3.(8); Part 12; SB-'
12
Grading: 9.14.61.(1)
Electrical supply: 9.34.1.2.
Smoke alarms and carbon monoxide detectors: 9.10.19.; 9.33.4.
Exits: 9.9.9.; 9.9,6.4.(2); 9.9.7.5.; 9.6.4.1.
Floor access and egress systems: 9.9.9.1.; 9.8.1. - 9.8.6.
Handrails and Guards: 9.8.7.; 9.8.8.
Exhaust fume barrier between attached garage and dwelling unit: 9.10.13.15.
Resistance to forced entry between dwelling units and attached garage: 9.6.8.1.(1 ).(b)&(c)
Water supply and sewage disposal: 7.1.5.3.; 7.1.5.1.
Lighting system: 9.34.2.1.(1 ); 9.34.2.2.(1 ).; 9.34.2.2.(2).; 9.34.2.3.(2).&(3)
Heating system: 9.32.3.2.(1 ); 9.32.3.3.(1)
WaterSystem: 7.6.
Building drain and building sewer: 7.4.;
Drainage system and venting system: 7.4; 7.5; 7.3.6.1.(5); 7.3.6.2. - 7.3.6.7.
Required plumbing fixtures: 9.31.4.1.; 9.31.4.2.; 9.31.4.4.