Building permits — Leroy, Saskatchewan

Do I need a building permit? What does it cost?

In the Town of Leroy, Saskatchewan, building permit rules are set by Building Bylaw No. 5-2020, verified 2026-09-27. Exemptions: Accessory buildings with a building area not more than 10 m2, provided they do not create a hazard. Administered by: Local Authority (Town of LeRoy).

Building Bylaw No. 5-2020 adopted bylaw
permit required for New building construction, structural changes, RTM buildings, demolition, repair, relocation, alteration, addition, change of occupancy, accessory buildings larger than 10 sq. m, decks over 1200mm, basement development. s. 5(1)(a)-(h)
exemptions Accessory buildings with a building area not more than 10 m2, provided they do not create a hazard. s. 5(9)
fee basis Building permit: $100 administration fee plus service fees for plan review, field inspection of construction and enforcement, plus flat fee(s) charged by Saskatchewan Assessment Management Agency; demolition/removal permit: $50.00. s. 7(5)(a)-(c); s. 8(1)(a)
authority Local Authority (Town of LeRoy) s. 6(1); s. 6(3)
scout note

Town of LeRoy Bylaw 5-2020 respecting buildings, adopting the National Building Code under The Uniform Building and Accessibility Standards Act.

Machine-readable: building-permits.json · Official website: http://www.leroy.ca/ · Last verified 2026-09-27 · Building permits across Saskatchewan · Building permits in other municipalities